02.05.2018 Views

GE_OEC_9600_C-Arms

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Generator Calibration 35<br />

10R VERIFICATION PROCESS<br />

This is the process to ensure compliance with FDA requirements 80-8035, Section<br />

1020.32, part D2.<br />

1. In the MANUAL FLUORO mode, set the technique to 40 kV and 5.0 mA.<br />

2. Center an ion chamber in the X-ray beam 12-inches (30 cm) above the II as shown<br />

below.<br />

NOTE:<br />

Figure 9 - Dosimeter and Ion Chamber Set-up for 10R/Min Output<br />

3. Next, increase the kV slowly up to 120 kV allowing the dosimeter to stabilize its<br />

reading as kV increases. At no point should the Actual Dose Rate (See note<br />

below) exceed 9.26 R/min.<br />

If you are using an open air ion chamber, the measured dose rate (MDR) read on the<br />

dosimeter should be corrected for atmospheric pressure. This is know as the<br />

Actual Dose Rate (ADR). Calculate the ADR using the following formula.<br />

ADR = (760/P) (273.15 + T/295.15) * MDR<br />

P = Absolute Pressure in Millimeters of Mercury<br />

T = Temperature in degrees Celsius<br />

4. If necessary, perform the 10R Entrance Exposure Calibration beginning on the next<br />

page.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!