09.01.2013 Views

Content2011 - PETRONAS Gas Berhad

Content2011 - PETRONAS Gas Berhad

Content2011 - PETRONAS Gas Berhad

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Gateway to<br />

Invigorating Growth<br />

LNG Regasification Facilities<br />

In just one year since the last annual<br />

report, <strong>PETRONAS</strong> <strong>Gas</strong> <strong>Berhad</strong> (PGB) has<br />

embarked on the Liquefi ed Natural <strong>Gas</strong> (LNG)<br />

Regasification Facilities project. The project is<br />

a spin-off from the Company’s core business<br />

of gas processing in the Company’s efforts to<br />

explore new business opportunities.<br />

Located within the vicinity of the Sungai<br />

Udang Port area in Melaka, this engineering<br />

marvel, slated to be completed in record time,<br />

will soon become an energy gateway on one<br />

of the world’s busiest shipping lanes – the<br />

Straits of Malacca. Comprising three main<br />

components, this will be Malaysia’s fi rst ever<br />

LNG Regasification Facilities which will address<br />

the country’s energy supply challenges.<br />

The three main components of this state-of<br />

the-art terminal are:<br />

1. Two permanently berthed Floating Storage<br />

Units (FSU)<br />

2. One Jetty Regasifi cation Unit (JRU) which<br />

is the world’s fi rst-of-its-kind island jetty<br />

regasifi cation system connected to the<br />

mainland via a sub-sea pipeline<br />

3. Onshore pipeline which will connect with<br />

PGB’s existing Peninsular <strong>Gas</strong> Utilisation<br />

(PGU) pipeline network.<br />

LNG imported from various sources<br />

worldwide will be regasifi ed at this terminal.<br />

The process entails that the LNG tankers<br />

dock at the facility, transfer and store the<br />

LNG into one of the two FSUs, and the<br />

FSU then transfers the LNG to the JRU for<br />

the liquids to be vapourised into its original<br />

gas form. The gas then fl ows into the<br />

3km-long sub-sea pipeline and resurfaces via<br />

a dedicated onshore pipeline which travels<br />

another 30 km across the state of Melaka<br />

where it merges with the existing gas stream<br />

fl owing through the PGU pipeline network.<br />

It will be the much needed boost for the<br />

ever-increasing demand for gas, from both<br />

the power and non-power sector.<br />

Dock, transfer, store, regas and deliver.<br />

A multifaceted process made effi cient through<br />

state-of the-art technology.<br />

Best of all, we get to reaffi rm our business and<br />

technical credentials through and through.<br />

And at the same time, we’re also ensuring the<br />

nation’s clean energy supply remains reliable<br />

for us and our future generations…<br />

74 petronas gas berhad (101671-h)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!