Content2011 - PETRONAS Gas Berhad
Content2011 - PETRONAS Gas Berhad
Content2011 - PETRONAS Gas Berhad
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Gateway to<br />
Invigorating Growth<br />
LNG Regasification Facilities<br />
In just one year since the last annual<br />
report, <strong>PETRONAS</strong> <strong>Gas</strong> <strong>Berhad</strong> (PGB) has<br />
embarked on the Liquefi ed Natural <strong>Gas</strong> (LNG)<br />
Regasification Facilities project. The project is<br />
a spin-off from the Company’s core business<br />
of gas processing in the Company’s efforts to<br />
explore new business opportunities.<br />
Located within the vicinity of the Sungai<br />
Udang Port area in Melaka, this engineering<br />
marvel, slated to be completed in record time,<br />
will soon become an energy gateway on one<br />
of the world’s busiest shipping lanes – the<br />
Straits of Malacca. Comprising three main<br />
components, this will be Malaysia’s fi rst ever<br />
LNG Regasification Facilities which will address<br />
the country’s energy supply challenges.<br />
The three main components of this state-of<br />
the-art terminal are:<br />
1. Two permanently berthed Floating Storage<br />
Units (FSU)<br />
2. One Jetty Regasifi cation Unit (JRU) which<br />
is the world’s fi rst-of-its-kind island jetty<br />
regasifi cation system connected to the<br />
mainland via a sub-sea pipeline<br />
3. Onshore pipeline which will connect with<br />
PGB’s existing Peninsular <strong>Gas</strong> Utilisation<br />
(PGU) pipeline network.<br />
LNG imported from various sources<br />
worldwide will be regasifi ed at this terminal.<br />
The process entails that the LNG tankers<br />
dock at the facility, transfer and store the<br />
LNG into one of the two FSUs, and the<br />
FSU then transfers the LNG to the JRU for<br />
the liquids to be vapourised into its original<br />
gas form. The gas then fl ows into the<br />
3km-long sub-sea pipeline and resurfaces via<br />
a dedicated onshore pipeline which travels<br />
another 30 km across the state of Melaka<br />
where it merges with the existing gas stream<br />
fl owing through the PGU pipeline network.<br />
It will be the much needed boost for the<br />
ever-increasing demand for gas, from both<br />
the power and non-power sector.<br />
Dock, transfer, store, regas and deliver.<br />
A multifaceted process made effi cient through<br />
state-of the-art technology.<br />
Best of all, we get to reaffi rm our business and<br />
technical credentials through and through.<br />
And at the same time, we’re also ensuring the<br />
nation’s clean energy supply remains reliable<br />
for us and our future generations…<br />
74 petronas gas berhad (101671-h)