09.01.2013 Views

Content2011 - PETRONAS Gas Berhad

Content2011 - PETRONAS Gas Berhad

Content2011 - PETRONAS Gas Berhad

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The green initiative used pilot 3R (Reduce,<br />

Reuse and Recycle) concepts at PGB Head<br />

Offi ce, zooming on paper consumption<br />

reduction in an effort to instil awareness<br />

and embrace sustainability on waste issues.<br />

At other PGB divisions, leveraging on waste<br />

management as <strong>PETRONAS</strong> group-wide<br />

central issue this year, four other main<br />

activities were deployed. The activities include<br />

waste recycle programme, minimising water<br />

use and electricity consumption, scheduled<br />

waste management and electrical system<br />

improvement. Competition programmes<br />

zooming in on paper consumption reduction<br />

was held at PGB Head Offi ce; water and<br />

electricity consumption reduction competition<br />

at Transmission Operations Division (TOD);<br />

and general waste reduction competition at<br />

Centralised Utilities Facilities (CUF) and Plant<br />

Operations Divisions (POD) were also carried<br />

out.<br />

Various avenues were utilised to promote<br />

the 3R activities and programmes in order to<br />

inculcate awareness and sense of ownership<br />

of waste issues at sites. For PGB Head Offi ce,<br />

initiative on paper consumption reduction,<br />

an initial set target reduction based on<br />

last year’s consumption pattern was also<br />

communicated.<br />

The campaign met its objective of creating<br />

general awareness on the importance of paper<br />

consumption reduction. Similar campaign will<br />

be constantly organised in the near future<br />

as testimony of the Company’s commitment<br />

towards environmental preservation.<br />

For TOD, the campaigns generated positive<br />

results with a signifi cant improvement especially<br />

in the electricity savings after considering the<br />

greener and more sustainable options such<br />

as replacement to LED bulbs from the normal<br />

conventional bulbs. Notwithstanding that,<br />

other activities conducted simultaneously also<br />

generated positive results. This was particularly<br />

seen in the electricity and water resource<br />

savings as a result of awareness sessions being<br />

conducted to all staff.<br />

For CUF and POD, the campaigns went on<br />

to inculcate more awareness to staff where<br />

activities related to conserving environmental<br />

resources like car-pooling instead of single<br />

driver to and from offi ce, greening offi ce<br />

buildings by planting more trees at open or<br />

unoccupied spaces to minimise heat-island<br />

effects (a phenomenon which has accompanied<br />

and increased with urbanization, and it refers<br />

to the fact that man-made structures tend to<br />

attract and retain heat at a higher rate than<br />

normal in nature. This results in an increase<br />

in ground-level ozone production by as much<br />

as 30%. Hence, energy saving campaigns<br />

by switching off lights at unutilised areas,<br />

electrical devices such as computers and<br />

utilising offi ce blinds to reduce internal heat<br />

were conducted. On top of that, talks on<br />

energy saving were conducted regularly to<br />

instil awareness among staff.<br />

ENVIRONMENTAL RISK REPORTING<br />

The year under review also showed an<br />

increasing improvement of the environmental<br />

risk reporting via PGB Health Safety and<br />

Environmental Management System such<br />

as Environmental Aspect Impact exercises,<br />

Environmental Impact Assessment (EIA)/<br />

Quantitative Risk Assessment (QRA) report<br />

preparations as well as internal audits. With<br />

POD being the latest division to be certifi ed with<br />

ISO 14000:2004 (Environmental Management<br />

Systems), prompt reviews of consultants’ draft<br />

reports by HSE staff ensures the feedback<br />

will be given on time to further support asset<br />

owner on any potentially damaging risks to<br />

the environment. Many projects were covered<br />

effectively this year, which include the PGU 1<br />

8 Butane Pipeline Replacement and Relocation<br />

project (PGURE), LNG Regasifi cation Facilities<br />

project, CO2 Supply to MOX Linde (COSMO),<br />

Retrofi tting Works for Turbotronic 4 Upgrade<br />

at Kerteh Compressor Station at GPPA<br />

KCS-A, GPP-A (Turbotronic), Export Terminal’s<br />

Loading Arm project, PasirGudang/Gambang<br />

and Tronoh City Gates projects.<br />

97 annUaL report 2011<br />

4G Initiative is a<br />

programme which<br />

aims to improve<br />

staff awareness and<br />

commitment towards<br />

environmental<br />

sustainability.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!