23.01.2013 Views

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Planning and envir<strong>on</strong>mental health issues:<br />

Mr Deverell had not received any complaints about noise. The <strong>Thames</strong> footpath<br />

bisects <strong>the</strong> site cutting <strong>the</strong> riverside element from <strong>the</strong> landward element although<br />

this did not seem to cause any major problems.<br />

Relati<strong>on</strong>ship to adjoining land uses/o<strong>the</strong>r boatyard facilities:<br />

The site is surrounded by o<strong>the</strong>r industrial operati<strong>on</strong>s including a refinery and tarmac<br />

plant.<br />

Access arrangements (capacity, proximity to major roads):<br />

The site is accessed <str<strong>on</strong>g>of</str<strong>on</strong>g>f Banning Road (a local road). The nearest major road is <strong>the</strong><br />

A102 Blackwall Tunnel Approach.<br />

Comments (2000)<br />

The site is an important commercial repair facility and maintains many <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> larger<br />

passenger boats working <strong>on</strong> <strong>the</strong> <strong>Thames</strong>. There has been recent substantial<br />

investment in <strong>the</strong> form <str<strong>on</strong>g>of</str<strong>on</strong>g> a new floating dry dock that cost approximately £250,000.<br />

This can accommodate all but <strong>the</strong> largest passenger vessels currently in operati<strong>on</strong> <strong>on</strong><br />

<strong>the</strong> <strong>Thames</strong>.<br />

Comments (2007)<br />

<strong>Thames</strong> Craft Dry Docking has acquired a larger dry dock that is capable <str<strong>on</strong>g>of</str<strong>on</strong>g> docking<br />

Silver Sturge<strong>on</strong> that is 61 metres length x 13 metres beam. This dry dock is currently<br />

waiting downriver to be installed at Bay Wharf toge<strong>the</strong>r with <strong>the</strong> o<strong>the</strong>r dry docks that<br />

are to be re-located as part <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> S106 agreement that is attached to a planning<br />

permissi<strong>on</strong> to redevelop Lovell’s Wharf and Badcocks Wharf for mixed use<br />

development.<br />

Mr. Paul Deverell has commented that <strong>the</strong> scheme is “in abeyance” and is dependent<br />

<strong>on</strong> <strong>the</strong> developer to discharge <strong>the</strong> S106 obligati<strong>on</strong>s. He has referred <strong>the</strong> study to Nick<br />

King <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> Greenwich Development Agency for fur<strong>the</strong>r informati<strong>on</strong>.<br />

Nick King is to provide details <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> relocati<strong>on</strong> to Bay Wharf.<br />

<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007<br />

97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!