23.01.2013 Views

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> Record Sheet<br />

<str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> number: 21 (32)<br />

Premises<br />

Trading Name: Colliers Launches<br />

Teleph<strong>on</strong>e no: (020) 8892 0741<br />

Address : St Margarets Road<br />

Isleworth<br />

Middlesex<br />

Postcode:<br />

Operator: Arthur Collier & S<strong>on</strong>s<br />

Tenant: Yes (licensee)<br />

Freeholder: PLA<br />

Borough: Hounslow<br />

<str<strong>on</strong>g>Facilities</str<strong>on</strong>g><br />

Open slipway: No<br />

Land storage: No<br />

Covered slipway: No<br />

P<strong>on</strong>to<strong>on</strong> moorings: No<br />

Dry dock: Yes<br />

Buoy/bankside moorings: Yes (operati<strong>on</strong>al buoy moorings)<br />

Boat Hoist/Crane: Yes (crane)<br />

Covered workshop: Yes<br />

Chandlery: No<br />

Max dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> craft that can be slipped / dry docked /lifted / moored<br />

Length: 39.6 metres<br />

Beam: 7.9 metres<br />

T<strong>on</strong>nage: Not applicable<br />

Employee numbers<br />

5 boatbuilders (permanent staff)<br />

10 carpenters, painters and electricians (employed <strong>on</strong> short term c<strong>on</strong>tracts)<br />

C<strong>on</strong>text<br />

Planning and envir<strong>on</strong>mental health issues:<br />

Mr Collier has suffered from complaints about <strong>the</strong> noise generated by his activities<br />

by <strong>the</strong> residents <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> new housing that has been developed adjacent to <strong>the</strong> site.<br />

The same residents have also complained about <strong>the</strong> o<strong>the</strong>r boatyard operati<strong>on</strong>s by <strong>the</strong><br />

Ait, adjacent to <strong>the</strong>ir houses. Mr Collier has operated from <strong>the</strong> site for 18 years and<br />

several years ago, brought in a larger floating dry dock to replace <strong>the</strong> existing floating<br />

dry dock at <strong>the</strong> site which was becoming too small for <strong>the</strong> craft <strong>the</strong>y maintain. The LB<br />

Hounslow have since instigated enforcement acti<strong>on</strong> against <strong>the</strong> dry dock alleging it is<br />

a breach <str<strong>on</strong>g>of</str<strong>on</strong>g> planning c<strong>on</strong>trol and a public inquiry to hear <strong>the</strong> appeal against <strong>the</strong><br />

enforcement notice was held in April, 2000. Mr. Collier w<strong>on</strong> his appeal against<br />

enforcement acti<strong>on</strong>. In 2003 he obtained planning permissi<strong>on</strong> to ro<str<strong>on</strong>g>of</str<strong>on</strong>g> over <strong>the</strong> dry<br />

dock to reduce potential noise impacts bey<strong>on</strong>d <strong>the</strong> site and to enable better quality<br />

paint finishes to be achieved during <strong>the</strong> winter. The ro<str<strong>on</strong>g>of</str<strong>on</strong>g> has not been c<strong>on</strong>structed<br />

due to o<strong>the</strong>r priorities.<br />

<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007<br />

73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!