Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
42<br />
Revisi<strong>on</strong>s to <strong>the</strong> applicati<strong>on</strong> indicated in October 2005 were submitted to <strong>the</strong> Council<br />
<strong>on</strong> 30 November 2005 (ultimately published <strong>on</strong> 10 January 2006). These revisi<strong>on</strong>s<br />
reduced <strong>the</strong> number <str<strong>on</strong>g>of</str<strong>on</strong>g> residential units by <strong>on</strong>e and also altered <strong>the</strong> design <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
buildings, included alterati<strong>on</strong>s to <strong>the</strong> landscaping details and bridge. The alterati<strong>on</strong>s<br />
are described at:<br />
http://www.ukplanning.com/richm<strong>on</strong>d/doc/O<strong>the</strong>r-2568219.pdf?extensi<strong>on</strong>=.pdf&id=<br />
2568219&locati<strong>on</strong>=VOLUME2&c<strong>on</strong>tentType=applicati<strong>on</strong>/pdf&pageCount=11<br />
The applicati<strong>on</strong> is yet to be determined by <strong>the</strong> L<strong>on</strong>d<strong>on</strong> Borough <str<strong>on</strong>g>of</str<strong>on</strong>g> Richm<strong>on</strong>d Up<strong>on</strong><br />
<strong>Thames</strong>. The most recent technical work put toge<strong>the</strong>r by <strong>the</strong> Borough and applicant<br />
is in relati<strong>on</strong> to a bat survey and envir<strong>on</strong>mental aspects <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> scheme. Objecti<strong>on</strong>s to<br />
<strong>the</strong> scheme have been raised by <strong>the</strong> EA and English Nature. Nothwithstanding this,<br />
<strong>the</strong> GLA Biodiversity unit has supported <strong>the</strong> findings <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> survey and expressed a<br />
view that <strong>the</strong> recommendati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> report should be secured through planning<br />
c<strong>on</strong>diti<strong>on</strong>.<br />
Comments (2000)<br />
In 2000 we commented that <strong>the</strong> yard is engaged in <strong>the</strong> repair and maintenance <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
maritime ra<strong>the</strong>r than river craft that are normally wooden. Mr Woollard stated that, as<br />
o<strong>the</strong>r facilities closed down, <strong>the</strong>y were becoming a wooden boat specialist. There<br />
was no shortage <str<strong>on</strong>g>of</str<strong>on</strong>g> work available and it was <strong>the</strong> facilities available to him that<br />
dictated how much he could take <strong>on</strong>. He was not however prepared to invest in <strong>the</strong><br />
facilities, which had been allowed to decline into a state <str<strong>on</strong>g>of</str<strong>on</strong>g> disrepair by <strong>the</strong> owners<br />
as his lease expired in 2001 and it was unclear what <strong>the</strong> future <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> site is, given<br />
that a development company own it.<br />
We have been unable to c<strong>on</strong>tact Otter Marine in 2007 but understand that <strong>the</strong><br />
boatyard is still in operati<strong>on</strong>.<br />
<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007