Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
111<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> floating dry dock for hull work, antifouling etc. Work is <strong>on</strong>ly undertaken <strong>on</strong> PLA<br />
vessels. Dent<strong>on</strong> Wharf is a safeguarded wharf and <strong>the</strong>refore, <strong>the</strong> wharf could <strong>on</strong>ly be<br />
developed for boatbuilding and repair if it was no l<strong>on</strong>ger appropriate to retain its use<br />
as a commercial wharf.<br />
Comments (2007)<br />
The PLA has made c<strong>on</strong>siderable improvements to <strong>the</strong> facilities at Dent<strong>on</strong> Wharf since<br />
<strong>the</strong> 2000 study. These include:<br />
• A hoist dock and travel capable <str<strong>on</strong>g>of</str<strong>on</strong>g> lifting vessels up to 65 t<strong>on</strong>s and 21/22 metres<br />
l<strong>on</strong>g by 6.8 metres beam – providing it is properly balanced;<br />
• Workshops and base for PLA divers including training tank and decompressi<strong>on</strong><br />
tank;<br />
• Offices;<br />
• A new workshop building for <strong>the</strong> grit blasting chamber – large enough for buoys<br />
and small craft; and<br />
• Hardstanding<br />
The PLA plans to harden <str<strong>on</strong>g>of</str<strong>on</strong>g>f more <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> inner quay to provide hard standing for<br />
vessels lifted by <strong>the</strong> travel hoist. The main c<strong>on</strong>straint is <strong>the</strong> width <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> gate in <strong>the</strong><br />
flood wall.<br />
Dent<strong>on</strong> Wharf is available for use by third parties and users include:<br />
• <strong>Thames</strong> Clippers (<strong>the</strong> small 62 seater catamaran);<br />
• Briggs Marine and o<strong>the</strong>r watermens’ mooring boats;<br />
• Capital Pleasure boats;<br />
• Van Orde Dredging;<br />
• Private individuals.<br />
The facilities at Dent<strong>on</strong> Wharf are not sufficient to maintain all <strong>the</strong> PLA’s craft. The<br />
patrol craft are maintained at Gillingham Marina. The salvage craft (30 x 10 metres x<br />
300 t<strong>on</strong>nes) is refitted at ABP Port <str<strong>on</strong>g>of</str<strong>on</strong>g> Lowest<str<strong>on</strong>g>of</str<strong>on</strong>g>t.<br />
The PLA has objected to Gravesham Borough Council’s draft SPD for <strong>the</strong> Canal Basin<br />
/ North East Gravesend waterfr<strong>on</strong>t sites. The PLA c<strong>on</strong>siders that <strong>the</strong> residential<br />
proposals could prejudice <strong>the</strong> operati<strong>on</strong>s at Dent<strong>on</strong> Wharf and at Dent<strong>on</strong> Slipway.<br />
The PLA has arranged a meeting with Gravesham Borough and SEEDA to explore <strong>the</strong><br />
opportunity for a cluster <str<strong>on</strong>g>of</str<strong>on</strong>g> marine based industries at north-east Gravesend.<br />
<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007