23.01.2013 Views

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

103<br />

Access arrangements (capacity, proximity to major roads):<br />

The site is reached via <strong>the</strong> old dock gate road that currently still has a security<br />

checkpoint. This road joins Woolwich Manor Way (a local distributor route) that leads<br />

up to <strong>the</strong> A13.<br />

Comments (2000)<br />

The site is currently being developed with a chandlery and o<strong>the</strong>r facilities. The<br />

operators would also like to build a slipway as a suitable site exists for such a facility.<br />

Comments (2007)<br />

There is a large amount <str<strong>on</strong>g>of</str<strong>on</strong>g> informati<strong>on</strong> about this site that is relevant to this study.<br />

1 We have met with Eric Miller who runs Galli<strong>on</strong>s Point Marina and his comments<br />

are set out in Appendix 5.<br />

2 Newham Council has adopted <strong>the</strong> Royal Albert Basin Development Framework<br />

Plan Supplementary Planning Guidance. The guidance proposes residential<br />

development <strong>on</strong> Royal Albert Island that takes part <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> existing Galli<strong>on</strong>s Point<br />

Marina site. This residential development is located close to <strong>the</strong> existing<br />

boatyards workshop. In additi<strong>on</strong> <strong>the</strong>re are a number <str<strong>on</strong>g>of</str<strong>on</strong>g> o<strong>the</strong>r proposals including<br />

a slipway and 8,600 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> marine employment floorspace <strong>on</strong> a<br />

former PLA marine repair site that is now used by Newham College.<br />

3 Jackie Lindre <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> LDA has advised that it is unlikely that it will be possible to<br />

implement <strong>the</strong> marine employment proposals due to <strong>the</strong> difficulty in relocating<br />

Newham College. Jim Lewis <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> East L<strong>on</strong>d<strong>on</strong> Learning and Skills Council<br />

(LSC) has advised that <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> skills training at Galli<strong>on</strong>s Point is<br />

undertaken by John Laing Training <strong>on</strong> a franchise basis and that this is not <strong>the</strong><br />

preferred method <str<strong>on</strong>g>of</str<strong>on</strong>g> training provisi<strong>on</strong>. Newham College is investing in new<br />

c<strong>on</strong>structi<strong>on</strong> training facilities in Barking.<br />

4 Sean Collins has advised that NQEA <strong>the</strong> builders <str<strong>on</strong>g>of</str<strong>on</strong>g> some <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> <strong>Thames</strong><br />

Clippers has looked at this site with a view to providing up to date boat<br />

maintenance facilities.<br />

<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!