Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
54<br />
<str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> Record Sheet<br />
<str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> number: 10 (22)<br />
Premises<br />
Trading Name: Teddingt<strong>on</strong> Harbour Ltd (formerly Suntest Marine)<br />
Teleph<strong>on</strong>e no: (0208) 9779978<br />
Address : 27 Ferry Road<br />
Teddingt<strong>on</strong><br />
Middx<br />
Postcode: TW11 9NN<br />
Operator: Malcolm Miatt<br />
Tenant: Yes<br />
Freeholder: -<br />
Borough: Richm<strong>on</strong>d up<strong>on</strong> <strong>Thames</strong><br />
<str<strong>on</strong>g>Facilities</str<strong>on</strong>g><br />
Open slipway: Yes (Public)<br />
Land storage: Yes<br />
Covered slipway: No<br />
P<strong>on</strong>to<strong>on</strong> moorings: Yes (80 berths)<br />
Dry dock: No<br />
Buoy/bankside moorings: No<br />
Boat Hoist/Crane: No<br />
Covered workshop: Yes<br />
Chandlery: Yes<br />
Max dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> craft that can be slipped / dry docked / lifted / moored<br />
Length: 6.7 metres<br />
Beam: 3 metres<br />
T<strong>on</strong>nage: 6 t<strong>on</strong>nes<br />
Employee numbers<br />
7 staff in total: Teddingt<strong>on</strong> Harbour<br />
3 servicing and mooring management<br />
1 chandlery<br />
Toughs <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g><br />
3 marine engineers<br />
Comments (2000)<br />
The site (and in particular <strong>the</strong> moorings) has been progressively upgraded over <strong>the</strong><br />
past few years. The Envir<strong>on</strong>ment Agency has also recently installed a grid which<br />
Teddingt<strong>on</strong> Harbour administers. Mr Miatt wanted to improve facilities fur<strong>the</strong>r by<br />
providing a fuelling point and a pump out stati<strong>on</strong>. Toughs have relocated to Teddingt<strong>on</strong><br />
Harbour after selling <strong>the</strong>ir site for redevelopment. They use <strong>the</strong> slipway at Swan<br />
Island for repair work when necessary.<br />
Comments (2007)<br />
The operati<strong>on</strong>s at Teddingt<strong>on</strong> Harbour have been steady since <strong>the</strong> previous study in<br />
2000. The employees at <strong>the</strong> operati<strong>on</strong> and works <strong>on</strong> site have not altered and <strong>the</strong><br />
operator, Mr Miatt, noted that business was steady from <strong>the</strong> previous study. As<br />
detailed in <strong>the</strong> 2000 study, <strong>the</strong>re was an aspirati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> boatyard operator to include<br />
a fuelling point as part <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> operati<strong>on</strong>s at <strong>the</strong> Teddingt<strong>on</strong> Harbour. The planning for<br />
this facility has not progressed since <strong>the</strong> 2000 study although <strong>the</strong> desire to develop<br />
a fuelling point has not diminished. The lack <str<strong>on</strong>g>of</str<strong>on</strong>g> funding for such a facility was seen as<br />
<strong>the</strong> greatest barrier to developing it.<br />
<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007