Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
40<br />
<str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> Record Sheet<br />
<str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> number: 2 (11)<br />
Premises<br />
Trading Name: Unknown<br />
Teleph<strong>on</strong>e no:<br />
Address : <strong>Thames</strong> Street<br />
Lower Sunbury<br />
Middx<br />
Postcode: TW16 5QG<br />
Operator:<br />
Tenant: No<br />
Freeholder: Understood to be Mr. and Mrs. P Shepherd<br />
Borough: Spelthorne<br />
<str<strong>on</strong>g>Facilities</str<strong>on</strong>g><br />
Open slipway: Yes<br />
Land storage: Yes<br />
Covered slipway: Yes<br />
P<strong>on</strong>to<strong>on</strong> moorings: No<br />
Dry dock: No<br />
Buoy/bankside moorings: Yes<br />
Boat Hoist/Crane: Yes (Hoist)<br />
Covered workshop: Yes<br />
Chandlery: No<br />
Max dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> craft that can be slipped / dry docked / lifted / moored<br />
Length: 24 metres<br />
Beam: 6 metres<br />
T<strong>on</strong>nage:<br />
C<strong>on</strong>text<br />
R J Turk and S<strong>on</strong>s declined to engage in <strong>the</strong> 2000 study because <strong>the</strong> firm was in <strong>the</strong><br />
process <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g>fering <strong>the</strong> site for sale. No fewer than 14 applicati<strong>on</strong>s have been made<br />
since 1994 ei<strong>the</strong>r for c<strong>on</strong>servati<strong>on</strong> area c<strong>on</strong>sent to demolish buildings or for<br />
residential development.<br />
The new owners have obtained planning permissi<strong>on</strong> to erect two dwellings <strong>on</strong> <strong>the</strong><br />
<strong>Thames</strong> Street fr<strong>on</strong>tage. They have submitted ano<strong>the</strong>r planning applicati<strong>on</strong> for a<br />
live/work unit and <strong>the</strong> retenti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> covered slipway to cater for boats up to 24<br />
metres l<strong>on</strong>g x 6 metres beam.<br />
Comments (2007)<br />
This yard is no l<strong>on</strong>ger used by R J Turk & S<strong>on</strong>s. There is some doubt as to whe<strong>the</strong>r<br />
<strong>the</strong> new owners will make <strong>the</strong> covered slipway available for use or whe<strong>the</strong>r <strong>the</strong> l<strong>on</strong>g<br />
term intenti<strong>on</strong> is to secure residential development <strong>on</strong> <strong>the</strong> whole site.<br />
<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007