23.01.2013 Views

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

28<br />

• Newham College occupies <strong>the</strong> former <strong>Thames</strong> House that was used by <strong>the</strong> PLA<br />

to service buoys and o<strong>the</strong>r marine equipment; and<br />

• <strong>the</strong> site is in public ownership.<br />

5.10 There are, however, a number <str<strong>on</strong>g>of</str<strong>on</strong>g> significant c<strong>on</strong>straints:<br />

• <strong>the</strong> 6 metre building height would c<strong>on</strong>strain <strong>the</strong> usefulness <str<strong>on</strong>g>of</str<strong>on</strong>g> buildings;<br />

• <strong>the</strong>re would be restricti<strong>on</strong>s <strong>on</strong> <strong>the</strong> use <str<strong>on</strong>g>of</str<strong>on</strong>g> cranes;<br />

• <strong>the</strong> LDA is proposing residential development <strong>on</strong> <strong>the</strong> southwest side <str<strong>on</strong>g>of</str<strong>on</strong>g> Galli<strong>on</strong>s<br />

Marina creating a waterfr<strong>on</strong>t view into <strong>the</strong> marine employment site (see Figure<br />

5.2). The SPG also proposes a bridge that would sever <strong>the</strong> existing basin in <strong>the</strong><br />

marina that could provide a useful covered wet dock; and<br />

• <strong>the</strong> LDA has advised that it is unlikely to be possible to find a relocati<strong>on</strong> site for<br />

Newham College.<br />

5.11 It is bey<strong>on</strong>d <strong>the</strong> scope <str<strong>on</strong>g>of</str<strong>on</strong>g> this study to do much more than identify <strong>the</strong><br />

opportunities <strong>on</strong> this site and to make some very general indicati<strong>on</strong>s as to what could<br />

be provided here. In <strong>the</strong> course <str<strong>on</strong>g>of</str<strong>on</strong>g> our research we have obtained <strong>the</strong> following<br />

observati<strong>on</strong>s about <strong>the</strong> site.<br />

• It would be possible to create a facility large enough for <strong>the</strong> l<strong>on</strong>gest <strong>Thames</strong><br />

Clipper (38 metres length x 9.6 metres beam) but not <strong>the</strong> Silver Sturge<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

Woods <strong>River</strong> Cruises (61 metres x 13.4 metres).<br />

• Sean Collins <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>Thames</strong> Clippers has advised that UKAE, <strong>the</strong> designers <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong><br />

<strong>Thames</strong> Clippers, has looked at Galli<strong>on</strong>s Point Marina with a view to establishing<br />

modern marine repair facilities <strong>the</strong>re. However, <strong>the</strong> firm appears to have been<br />

unaware <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> possible availability <str<strong>on</strong>g>of</str<strong>on</strong>g> land fr<strong>on</strong>ting <strong>the</strong> <strong>Thames</strong> that forms part<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> Newham College site.<br />

• One way <str<strong>on</strong>g>of</str<strong>on</strong>g> overcoming <strong>the</strong> height restricti<strong>on</strong> may be to create a covered<br />

slipway dry dock that is partly dug into <strong>the</strong> ground.<br />

• The PLA has endorsed <strong>the</strong> c<strong>on</strong>cept <str<strong>on</strong>g>of</str<strong>on</strong>g> improved facilities in this locati<strong>on</strong><br />

suggesting that a hoist dock and travel hoist ra<strong>the</strong>r than a dry dock slipway<br />

would provide better flexibility in <strong>the</strong> use <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> site.<br />

Eric Miller <str<strong>on</strong>g>of</str<strong>on</strong>g> Galli<strong>on</strong>s Point Marina has said that he would have no objecti<strong>on</strong> to<br />

<strong>the</strong> rec<strong>on</strong>figurati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> land-based facilities <strong>on</strong> <strong>the</strong> marina site that includes<br />

an existing maintenance workshop. Generally L<strong>on</strong>d<strong>on</strong> City Airport seeks to<br />

restrict height <str<strong>on</strong>g>of</str<strong>on</strong>g> cranes to 15 metres but can go up to 17 metres. Relati<strong>on</strong>ships<br />

with L<strong>on</strong>d<strong>on</strong> City Airport are very good. The Marina always c<strong>on</strong>tacts LCR before<br />

<strong>the</strong> use <str<strong>on</strong>g>of</str<strong>on</strong>g> cranes and LCR always gives approval. (See Appendix 5).<br />

• <strong>the</strong> East L<strong>on</strong>d<strong>on</strong> Learning and Skills Council (LSC) has advised that <strong>the</strong> Newham<br />

College site provides c<strong>on</strong>structi<strong>on</strong> training through John Laing Training, a third<br />

party provider. This is not <strong>the</strong> preferred method <str<strong>on</strong>g>of</str<strong>on</strong>g> provisi<strong>on</strong> as far as <strong>the</strong> LSC is<br />

c<strong>on</strong>cerned. Such c<strong>on</strong>tracts are generally reviewed <strong>on</strong> a regular basis. Barking<br />

College opened a new building for c<strong>on</strong>structi<strong>on</strong> training in 2002. The LSC could<br />

organise marine skills training through Newham College subject to funding.<br />

5.12 Two opti<strong>on</strong>s are set out to indicate how <strong>the</strong> site could be used. Figure 5.3<br />

shows an arrangement comprising a draw dock slipway, wet dock and floating dry<br />

dock. Figure 5.4 shows an arrangement comprising a hoist dock, hardstanding and<br />

wet dock. Nei<strong>the</strong>r opti<strong>on</strong> strictly c<strong>on</strong>forms to <strong>the</strong> Royal Albert Basin SPG because<br />

that document seeks to use <strong>the</strong> waterfr<strong>on</strong>t areas <strong>on</strong> <strong>the</strong> south west side <str<strong>on</strong>g>of</str<strong>on</strong>g> Galli<strong>on</strong>s<br />

Point Marina to add value to residential development by providing a water fr<strong>on</strong>tage.<br />

However, for <strong>the</strong> allocati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 8.600 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> marine industry to be a viable<br />

propositi<strong>on</strong> it would be necessary to have facilities to enable vessels to be moved<br />

into <strong>the</strong> proposed workshops.<br />

<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!