23.01.2013 Views

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> Record Sheet<br />

<str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> number: 24 (35 and 36)<br />

Premises<br />

Trading Name: MSO Marine Services<br />

Teleph<strong>on</strong>e Number 020 8560 5159<br />

Address Dock Road<br />

Brentford<br />

Postcode TW8 8AG<br />

Operator Jake and Pauline Oliver<br />

Tenant Yes<br />

1. MSO C<strong>on</strong>structi<strong>on</strong> site – tenant <str<strong>on</strong>g>of</str<strong>on</strong>g> Stardale Ltd.<br />

Stardale has a lease to 2021 from BWB but MSO<br />

C<strong>on</strong>structi<strong>on</strong> <strong>on</strong>ly has a lease from Stardale Ltd. to June<br />

2007<br />

2. Former SPL site adjoining <strong>Thames</strong> Locks – MSO Marine<br />

Services has a 20 year lease from BWB<br />

3. MSO Marine Services has secured a lease from BW for<br />

part <str<strong>on</strong>g>of</str<strong>on</strong>g> Johns<strong>on</strong>’s Island (also known as Staffordshire Wharf)<br />

for <strong>the</strong> repair, maintenance and storage <str<strong>on</strong>g>of</str<strong>on</strong>g> boats, subject to<br />

planning and o<strong>the</strong>r c<strong>on</strong>sents. The 10-year lease commenced<br />

in Sept 2006.<br />

Freeholder British Waterways Board<br />

Borough: Hounslow<br />

Locati<strong>on</strong>: Grand Uni<strong>on</strong> adjacent to <strong>Thames</strong> Locks<br />

Boat Services<br />

Boat building Yes<br />

Plating, hull repairs and alterati<strong>on</strong>s Yes – including large amounts <str<strong>on</strong>g>of</str<strong>on</strong>g> plating<br />

Fit out Yes<br />

Engine installati<strong>on</strong>s and electrics Yes<br />

<str<strong>on</strong>g>Facilities</str<strong>on</strong>g><br />

Wet Dock Yes<br />

Dry Dock No<br />

Floating Dry Dock Two floating dry docks<br />

Slipway Only a small slipway<br />

Covered workshops Yes<br />

Boat Hoist / Crane Yes – crane barge<br />

Grids Three<br />

Max dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> craft that can be dry docked<br />

Dry Dock 1 Dry Dock 2<br />

Length 31.5 metres 20 metres<br />

Beam 7 metres 5 metres<br />

Max dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> craft that can be lifted<br />

Crane barge can lift vessels up to 5 t<strong>on</strong>s in weight<br />

<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007<br />

79

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!