Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
50<br />
<str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> Record Sheet<br />
<str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> number: 8 (17)<br />
Premises<br />
Trading Name: TW Allen and S<strong>on</strong> (Yachts) Ltd<br />
Teleph<strong>on</strong>e no: (0208) 9791997<br />
Address : Ash Island<br />
Hampt<strong>on</strong> Court<br />
East Molesey<br />
Middx<br />
Postcode: KT8 9AN<br />
Operator: Nick Allen (Director)<br />
Tenant: Yes<br />
Freeholder: Envir<strong>on</strong>ment Agency/3rd Parties<br />
Borough: Richm<strong>on</strong>d up<strong>on</strong> <strong>Thames</strong><br />
<str<strong>on</strong>g>Facilities</str<strong>on</strong>g><br />
Open slipway: Yes<br />
Land storage: Yes<br />
Covered slipway: Yes<br />
P<strong>on</strong>to<strong>on</strong> moorings: No<br />
Dry dock: No<br />
Buoy/bankside moorings: Yes (bankside)<br />
Boat Hoist/Crane: No<br />
Covered workshop: Yes<br />
Chandlery: No<br />
Max dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> craft that can be slipped / dry docked / lifted / moored<br />
Length: 12.1 metres<br />
Beam: 3.6 metres<br />
T<strong>on</strong>nage: 8 t<strong>on</strong>nes<br />
Employee numbers<br />
4 staff in total (2 <strong>on</strong> a c<strong>on</strong>tract basis): 2 management/boatbuilders (including Mr<br />
Allen)<br />
1 engineer (c<strong>on</strong>tract)<br />
1 boatbuilder (c<strong>on</strong>tract)<br />
C<strong>on</strong>text<br />
Planning and envir<strong>on</strong>mental health issues:<br />
Mr Allen has received complaints since a new housing scheme was developed <strong>on</strong> <strong>the</strong><br />
sou<strong>the</strong>rn bank (facing <strong>the</strong> site) a few years ago. The complaints have been about<br />
noise and vehicles bringing deliveries to a landing stage for transfer by boat to <strong>the</strong><br />
site. This culminated in a barrier being erected (for which Mr Allen has a key) so that<br />
delivery vehicles have to ring ahead so that he can meet <strong>the</strong>m at <strong>the</strong> barrier.<br />
Relati<strong>on</strong>ship to adjoining land uses/o<strong>the</strong>r boatyard facilities:<br />
There are no o<strong>the</strong>r buildings <strong>on</strong> <strong>the</strong> island apart from a house occupied by <strong>the</strong><br />
members <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> Allen family. Barfield Marine and Hampt<strong>on</strong> Ferry <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> are a few<br />
hundred metres upstream.<br />
Access arrangements (capacity, proximity to major roads):<br />
There is no vehicular access to <strong>the</strong> site and it is <strong>on</strong>ly possible to reach it by boat or<br />
by foot (across Molesey Lock). Mr Allen has to pay <strong>the</strong> Envir<strong>on</strong>ment Agency for <strong>the</strong><br />
<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007