23.01.2013 Views

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

Assessment of Boatyard Facilities on the River Thames - Mayor of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

34<br />

Example sites include land <strong>on</strong> or adjoining:<br />

• Beckt<strong>on</strong> Sewage Works<br />

• Crossness Sewage Works<br />

• <strong>the</strong> proposed Belvedere incinerator<br />

• Littlebrook Power Stati<strong>on</strong>, Dartford<br />

• L<strong>on</strong>g Reach Sewage Works, Dartford<br />

The link with marine industry skills training<br />

5.17 A number <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> resp<strong>on</strong>dents to this study have identified a shortage <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

workers with marine industry skills. A diverse range <str<strong>on</strong>g>of</str<strong>on</strong>g> skills is required including<br />

shipwright, welding, electrical and mechanical engineering, plumbing, carpentry and<br />

so forth. There is a potential for a new boatyard to be part <str<strong>on</strong>g>of</str<strong>on</strong>g> a broader regenerati<strong>on</strong><br />

initiative that includes training in marine industry skills.<br />

<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!