Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
Assessment of Boatyard Facilities on the River Thames - Mayor of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
64<br />
The developer appealed and a hearing was held (APPEAL REFERENCE –<br />
APP/L5810/A/04/1138182). The inspector found that no breach <str<strong>on</strong>g>of</str<strong>on</strong>g> planning c<strong>on</strong>trol had<br />
occurred because <strong>the</strong> original c<strong>on</strong>sent was not c<strong>on</strong>diti<strong>on</strong>ed to prevent <strong>the</strong> inserti<strong>on</strong><br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> structure within <strong>the</strong> covered slipway and such structures would not normally be<br />
subject to planning c<strong>on</strong>trol.<br />
Comment (2007)<br />
It is understood that <strong>the</strong>re is some boatyard use <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> slipway for small craft so this<br />
represents a small net gain as compared to <strong>the</strong> situati<strong>on</strong> in 2000.<br />
<str<strong>on</strong>g>Assessment</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Boatyard</str<strong>on</strong>g> <str<strong>on</strong>g>Facilities</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>River</strong> <strong>Thames</strong> Adams Hendry C<strong>on</strong>sulting Ltd - April 2007