27.02.2013 Views

0 - FTP Directory Listing - Nato

0 - FTP Directory Listing - Nato

0 - FTP Directory Listing - Nato

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

,<br />

I<br />

I<br />

I<br />

:<br />

I<br />

I<br />

33-4<br />

. I.<br />

psitiom am t!&ui~&. FN~~%~~zuc, EC~ZUB U&. WD~GV~P, &is is generally a<br />

&e &iiIity DO ITC~OS~~~OXI ~tditc kTd ifif~~wps *fhed vdue md CAUUUQ~ be ogti&d for a<br />

in orbit inn OR&H to m~lrimf5.c ~prtem @vel73 pnimtion. A three-* smbipised<br />

&~&hduy a00 an @mn lon@tv~dz mmures sy~aenrra % iag lo@ean& anxi latitude SXUIS<br />

iht &!Q S'jD8~io) PCWhl~Oll k3 VWWXd. genenatcd tBusu@~ a scan mirror<br />

~WW?XD~XTIU. 'hh then provides a more<br />

T$e dam p b m and redh~bpwrSiOaa of fle~.~~~ spRem. Additionally, the dwell<br />

xnetscorollo&ical 3 i omation ~ f current<br />

f<br />

time for signal integration can be<br />

$stern dm lends itself tb &e TACSAT selectively mntrolled to optimise signal to<br />

Qoncept. However, the format df data noise patio, image repetition frequency<br />

presentation may need fbrther and image size.<br />

development to ensure that the<br />

information presented is in ~Poe most The detector configuration is also an<br />

Eseful form. There may ~ P S O be, a o tion which needs further consideration.<br />

requirement for 'real-time' interrogation &r MOP, single element detectors were<br />

of the TACSAT system.<br />

used md this provided a relatively simple<br />

imaging system. Alternatively, a staring<br />

Throun Pn the appropriate seQection of array could be used. In this case a<br />

s y d l charneb, rneteorolo 0ca.1 data is boresight pointing system would be<br />

o tained on a 24 hour bask. f$y sclesoing required. Although this ma be an<br />

the iappro riaoe spectral ban& md their attractive option since t z e scan<br />

associate $ spectral widths, the most mecPnmisws are simplified, ir ma be<br />

approprhte information cm obtahed. difficult to obtain an IR ;imy or the<br />

AlPPl~ugh present metcorolo 'd system required d' ensions. For example an area<br />

provide much of the data a0 i&cly tO be of 1000 km ? with a resolutim of 1 km<br />

would require a 1024 x 1024 array.<br />

required by the theatre commder, the<br />

emphasis ow spectral bands for a<br />

TACSAT ma be different awd a full<br />

analysis woul B be required. lmdee& the<br />

system demands may be such that a<br />

variable band-pass should be employed<br />

thou the use of diffraction mung or<br />

tunab !@ e interference filters.<br />

For a TACSAT system operatlirmg in GEO,<br />

it is un.kc8 that full Earth mmee wiil<br />

be reqaedA Wibk conaepa wuld be<br />

zones of meteorological data amtred on<br />

the loation of interest. The obs2mtion<br />

or dwell times on a given region would<br />

then be controlled through a preset<br />

weighting scale Or by request from a<br />

ground commander.<br />

A possible need from a GEO TACSAT<br />

system is to produce hi er resolution<br />

images tban are currenty P available. Ef<br />

such a need is io be satisffisd, the<br />

fallowing points will need to be<br />

considered:<br />

i) scan mechanism / beam c+fldon<br />

ii) si@ KO nok ratio .<br />

iu de~~amr mnfi~tion<br />

iv I achimablc resolution<br />

v) saoelfite platform<br />

Firstly, the satellite platform cam k either<br />

spin or tbrec-axis ssabiliscd. For the<br />

former case, the satellite spin give one<br />

A different<br />

iic to use a<br />

before adopting such an approach. These<br />

include si@ to noise ratios, multiple<br />

rvaveband channels and detector cooling.<br />

The telescope system must be capable of<br />

providing the resolution within its<br />

diffraction limit. This then sets a<br />

re airement on the telescope aperture<br />

an 1<br />

angula- mgmfication. For the case of<br />

1 lan resolution, an aperture diameter of<br />

approximately 500 mm would bc required<br />

with a magnification of t pically 10.<br />

Current telescope system cr esigns have<br />

sloown that these paramcters can be<br />

readily met.<br />

A major benefit from a TACSAT<br />

meteorological capability will be<br />

indepaadlena from avilian :-: mms and<br />

mdod forecasting senrim so that in the<br />

event 00 10, mjor crisis during which the<br />

civil we@ may be switched off for<br />

reasons sf security, me tcorological<br />

forecasting is not lost to the Theatre<br />

c o w r .

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!