0 - FTP Directory Listing - Nato
0 - FTP Directory Listing - Nato
0 - FTP Directory Listing - Nato
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
,<br />
I<br />
I<br />
I<br />
:<br />
I<br />
I<br />
33-4<br />
. I.<br />
psitiom am t!&ui~&. FN~~%~~zuc, EC~ZUB U&. WD~GV~P, &is is generally a<br />
&e &iiIity DO ITC~OS~~~OXI ~tditc kTd ifif~~wps *fhed vdue md CAUUUQ~ be ogti&d for a<br />
in orbit inn OR&H to m~lrimf5.c ~prtem @vel73 pnimtion. A three-* smbipised<br />
&~&hduy a00 an @mn lon@tv~dz mmures sy~aenrra % iag lo@ean& anxi latitude SXUIS<br />
iht &!Q S'jD8~io) PCWhl~Oll k3 VWWXd. genenatcd tBusu@~ a scan mirror<br />
~WW?XD~XTIU. 'hh then provides a more<br />
T$e dam p b m and redh~bpwrSiOaa of fle~.~~~ spRem. Additionally, the dwell<br />
xnetscorollo&ical 3 i omation ~ f current<br />
f<br />
time for signal integration can be<br />
$stern dm lends itself tb &e TACSAT selectively mntrolled to optimise signal to<br />
Qoncept. However, the format df data noise patio, image repetition frequency<br />
presentation may need fbrther and image size.<br />
development to ensure that the<br />
information presented is in ~Poe most The detector configuration is also an<br />
Eseful form. There may ~ P S O be, a o tion which needs further consideration.<br />
requirement for 'real-time' interrogation &r MOP, single element detectors were<br />
of the TACSAT system.<br />
used md this provided a relatively simple<br />
imaging system. Alternatively, a staring<br />
Throun Pn the appropriate seQection of array could be used. In this case a<br />
s y d l charneb, rneteorolo 0ca.1 data is boresight pointing system would be<br />
o tained on a 24 hour bask. f$y sclesoing required. Although this ma be an<br />
the iappro riaoe spectral ban& md their attractive option since t z e scan<br />
associate $ spectral widths, the most mecPnmisws are simplified, ir ma be<br />
approprhte information cm obtahed. difficult to obtain an IR ;imy or the<br />
AlPPl~ugh present metcorolo 'd system required d' ensions. For example an area<br />
provide much of the data a0 i&cly tO be of 1000 km ? with a resolutim of 1 km<br />
would require a 1024 x 1024 array.<br />
required by the theatre commder, the<br />
emphasis ow spectral bands for a<br />
TACSAT ma be different awd a full<br />
analysis woul B be required. lmdee& the<br />
system demands may be such that a<br />
variable band-pass should be employed<br />
thou the use of diffraction mung or<br />
tunab !@ e interference filters.<br />
For a TACSAT system operatlirmg in GEO,<br />
it is un.kc8 that full Earth mmee wiil<br />
be reqaedA Wibk conaepa wuld be<br />
zones of meteorological data amtred on<br />
the loation of interest. The obs2mtion<br />
or dwell times on a given region would<br />
then be controlled through a preset<br />
weighting scale Or by request from a<br />
ground commander.<br />
A possible need from a GEO TACSAT<br />
system is to produce hi er resolution<br />
images tban are currenty P available. Ef<br />
such a need is io be satisffisd, the<br />
fallowing points will need to be<br />
considered:<br />
i) scan mechanism / beam c+fldon<br />
ii) si@ KO nok ratio .<br />
iu de~~amr mnfi~tion<br />
iv I achimablc resolution<br />
v) saoelfite platform<br />
Firstly, the satellite platform cam k either<br />
spin or tbrec-axis ssabiliscd. For the<br />
former case, the satellite spin give one<br />
A different<br />
iic to use a<br />
before adopting such an approach. These<br />
include si@ to noise ratios, multiple<br />
rvaveband channels and detector cooling.<br />
The telescope system must be capable of<br />
providing the resolution within its<br />
diffraction limit. This then sets a<br />
re airement on the telescope aperture<br />
an 1<br />
angula- mgmfication. For the case of<br />
1 lan resolution, an aperture diameter of<br />
approximately 500 mm would bc required<br />
with a magnification of t pically 10.<br />
Current telescope system cr esigns have<br />
sloown that these paramcters can be<br />
readily met.<br />
A major benefit from a TACSAT<br />
meteorological capability will be<br />
indepaadlena from avilian :-: mms and<br />
mdod forecasting senrim so that in the<br />
event 00 10, mjor crisis during which the<br />
civil we@ may be switched off for<br />
reasons sf security, me tcorological<br />
forecasting is not lost to the Theatre<br />
c o w r .