20.03.2013 Views

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Eurobodalla</strong> <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> <strong>Strategy</strong><br />

and 80/30thereafter). In addition, if in the future off-river storage is required it would be<br />

more feasible to construct a facility in the south of the shire to harvest and store high flows<br />

of the Tuross River. Modelling has revealed that with the implementation of the immediate<br />

and short term measures, based on existing supply sources the regional scheme would be<br />

able to meet a water demand of 6 400 ML/a while providing 95 th percentile low flow<br />

protection. Future implementation of 80 th percentile low flow would reduce secure yield of<br />

the supply system to 4 500 ML/a and necessitate the provision of additional water storage to<br />

maintain supply during droughts. The integrated options described below are based on new<br />

off-river storage in the south of the shire being implemented by 2020.<br />

Table 8-14 below shows how the various opportunities could be bundled to form integrated<br />

options to meet the projected year 2032 water needs.<br />

Table 8-14 Regional <strong>Water</strong> Supply <strong>Integrated</strong> Options<br />

<strong>Integrated</strong> options<br />

Traditional<br />

1 2 3 4 5 6 7<br />

Limited Demand <strong>Management</strong> <br />

Comprehensive Demand <strong>Management</strong> <br />

10 kL rainwater tanks in all new<br />

developments and 20% existing<br />

houses<br />

Provision of reticulated water supply to<br />

high priority villages<br />

Provision of reticulated water supply to<br />

low priority villages<br />

Reclaimed<br />

<strong>Water</strong> Reuse<br />

<br />

<br />

<br />

Agriculture <br />

Non-potable water in<br />

new developments<br />

(dual reticulation)<br />

Aquifer recharge for<br />

subsequent nonpotable<br />

water use<br />

Environmental flow<br />

substitution<br />

Southern dam for the regional scheme<br />

(x 1000 ML)<br />

<br />

<br />

5.6 1.5 0.9 0.93 1.01 1.01 0.84 0<br />

8.5.2 Description of the Regional <strong>Water</strong> Supply <strong>Integrated</strong> Options<br />

Traditional<br />

This option consists of:<br />

Immediate and short term measures as discussion in section 8.3.3. Initially the<br />

northern and southern filtration plants would be 45 ML/d and 15 ML/d respectively<br />

A waterwise education program<br />

Provision of reticulated water supply to high priority villages<br />

Provision of reticulated water supply to low priority villages<br />

Maximised reclaimed water reuse for agriculture<br />

<br />

99

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!