Figure 9-20 Dalmeny/Kianga/Narooma Stormwater Sub-Catchments<br />

9.12.2 What Are the Issues?<br />

The issues associated with the landscape and water management systems can be<br />

classified into environmental, social and water infrastructure performance. These issues are<br />

discussed below.<br />

Environmental and Social Issues<br />

Wagonga Inlet contains oyster leases. The discharge of sewage and stormwater<br />

runoff to the environment poses not only a risk to public health but a risk also of<br />

productivity loss to the oyster industry,<br />

The community perception is that the treatment works discharges to the adjacent<br />

lake, whereas the effluent is actually discharged into the ocean,<br />

Overflow may occur from pump stations during power outages,<br />

There is a history of community complaints about odours from the inlet works of the<br />

STP.<br />