20.03.2013 Views

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

xxiv<br />

<strong>Eurobodalla</strong> <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> <strong>Strategy</strong><br />

95/30 Refers to a condition under which water is licenced for extraction<br />

from the river. 95 refers to the 95 th percentile of flows, that is the<br />

highest 95% of the time the river flows the water can be<br />

extracted. The remaining 5% of the time is when the river is little<br />

water and this may not be extracted. 30 refers to the the amount<br />

of water in the river that must be shared between the users (30%)<br />

80/30 Refers to a condition under which water is licenced for extraction<br />

from the river. 80 refers to the 80 th percentile of flows, that is the<br />

highest 80% of the time the river flows the water can be<br />

extracted. The remaining 5% of the time is when the river is little<br />

water and this may not be extracted. 30 refers to the the amount<br />

of water in the river that must be shared between the users<br />

(30%). An 80/30 condition protect the river more than a 95/30<br />

condition

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!