20.03.2013 Views

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

216<br />

ML/a<br />

<strong>Eurobodalla</strong> <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> <strong>Strategy</strong><br />

Current<br />

Extraction<br />

(without turbidity<br />

constraints)<br />

9000<br />

8000<br />

7000<br />

6000<br />

5000<br />

4000<br />

3000<br />

2000<br />

1000<br />

0<br />

2002<br />

2004<br />

2006<br />

Environmental<br />

Flow Protection (95/30)<br />

2008<br />

2010<br />

2012<br />

2014<br />

Figure 10-5 <strong>Integrated</strong> Scenario 4<br />

<strong>Integrated</strong> Scenario 5<br />

<strong>Water</strong>wise Education<br />

2016<br />

2018<br />

Year<br />

Higher Environmental<br />

Flow Protection (80/30)<br />

2020<br />

2022<br />

2024<br />

2026<br />

2028<br />

2030<br />

2032<br />

1010ML Southern Dam<br />

Impact of rainwater<br />

tanks<br />

Impact of pipeline<br />

upgrade<br />

Existing system<br />

Demand<br />

Demand managed<br />

demand<br />

Comprehensive demand management including water sensitive urban design for all<br />

new developments<br />

10 kL rainwater tanks in new developments and 20% of existing houses,<br />

Provision of reticulated water supply to high priority villages,<br />

Provision of reticulated water supply to low priority villages,<br />

Reclaimed water reuse for agriculture,<br />

Southern Dam capacity 1 010 ML,<br />

Upgrade Batemans Bay transport system including bypass along Spine Road<br />

alignment and Batemans Bay STP upgrade,<br />

Transfer Batemans Bay southern catchment sewerage to Tomakin STP and<br />

enhance existing Tomakin STP capacity,<br />

Enhance the existing Narooma STP capacity when load meets capacity,<br />

Improved management of urban stormwater in high priority catchments (see note 1<br />

above),<br />

Provision of reticulated sewage for high priority villages,<br />

Provision of reticulated sewage for low priority villages.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!