20.03.2013 Views

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

210<br />

<strong>Eurobodalla</strong> <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> <strong>Strategy</strong><br />

villages have been placed in the low priority group, as the residents from both villages did<br />

not rank an improved water supply as of high importance.<br />

Urban stormwater management has also been classified into high and low priority locations.<br />

This division is based on the type of issue and the impact it has on the environment and<br />

community.<br />

10.2 Scenario Building<br />

The Table 10-1 below presents examples of Shire wide integrated scenarios, developed<br />

using the regional integrated water cycle management options. In order to simplify the<br />

building and assessment process the IWCM options available at each village have been<br />

reduced to two options; improve the existing on-site water supply and wastewater<br />

management systems or provide a reticulated water and sewerage system.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!