20.03.2013 Views

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Eurobodalla</strong> <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> <strong>Strategy</strong><br />

9 Local <strong>Water</strong> <strong>Management</strong><br />

Opportunities<br />

9.1 Introduction<br />

<strong>Eurobodalla</strong> Shire is comprised of 15 towns and villages. IWCM strategies have been<br />

proposed for each town and village to address the local landscape, water services and<br />

community issues.<br />

Although community presentation and information sessions were undertaken as part of this<br />

study process, it is generally accepted that these sessions were more regionally focused<br />

and therefore were held at the major urban areas. Thus further consultation will be<br />

undertaken at various villages to gain a greater focus on local issues and management<br />

strategies before any option is selected as the preferred solution for the respective<br />

community.<br />

The ranking process used for the TBL assessment is based on scoring each integrated<br />

option from 0-3. The score is based on the appropriateness of each option in achieving the<br />

specified environmental, social and economic criteria, with 0 representing a poor outcome<br />

and 3 representing the most appropriate option. Equal weighting is given to the<br />

environmental, social and economic criteria.<br />

It is important to note that the discrepancies in the data between dwelling numbers and onsite<br />

sewerage systems is due to the data originating from two differing sources, namely the<br />

ABS and Council’s Geographical Information Systems (GIS). The discrepancy can be<br />

attributed to unregistered on-site systems and properties having more than one on-site<br />

facility, and the ABS having collection districts different to the village areas.<br />

105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!