Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ML/a<br />

9000<br />

8000<br />

7000<br />

6000<br />

5000<br />

4000<br />

3000<br />

2000<br />

1000<br />

<strong>Eurobodalla</strong> <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> <strong>Strategy</strong><br />

Current<br />

Extraction<br />

(without turbidity Environmental<br />

constraints) Flow Protection (95/30)<br />

0<br />

2002<br />

2004<br />

2006<br />

2008<br />

2010<br />

2012<br />

2014<br />

2016<br />

Figure 10-6 <strong>Integrated</strong> Scenario 5<br />

<strong>Integrated</strong> Scenario 6<br />

<strong>Water</strong>wise Education<br />

2018<br />

Year<br />

Higher Environmental<br />

Flow Protection (80/30)<br />

2020<br />

2022<br />

2024<br />

2026<br />

2028<br />

2030<br />

2032<br />

1010ML Southern dam<br />

Impact of rainwater tanks<br />

Impact of pipeline upgrade<br />

Existing system<br />

Demand<br />

Demand managed demand<br />

Comprehensive demand management including water sensitive urban design for all<br />

new developments<br />

10 kL rainwater tanks in new developments and 20% of existing houses,<br />

Provision of reticulated water supply to high priority villages,<br />

Provision of reticulated water supply to low priority villages,<br />

Reclaimed water reuse for agriculture,<br />

Reclaimed water reuse for aquifer recharge for subsequent non-potable water use,<br />

Reclaimed water reuse for non-potable water use in new developments (dual<br />

reticulation),<br />

Southern Dam capacity 840 ML,<br />

Upgrade Batemans Bay transport system including bypass along Spine Road<br />

alignment and Batemans Bay STP upgrade,<br />

Transfer Batemans Bay southern catchment sewerage to Tomakin STP and<br />

enhance existing Tomakin STP capacity,<br />

Enhance the existing Narooma STP capacity when load meets capacity,<br />

Improved management of urban stormwater in high priority catchments (see note 1<br />

above)<br />

Provision of reticulated sewage for high priority villages<br />

217