20.03.2013 Views

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

150<br />

<strong>Eurobodalla</strong> <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> <strong>Strategy</strong><br />

9.6.5 Triple Bottom Line Assessment for Rosedale and Guerilla Bay<br />

Table 9-18 Triple Bottom Line Assessment for Rosedale and Guerilla Bay<br />

ENVIRONMENTAL<br />

Efficient use of fresh water<br />

resource<br />

Minimises low flow water<br />

extractions<br />

Minimises greenhouse gas<br />

emissions<br />

Minimises pollutants being<br />

discharged to the aquatic<br />

environment<br />

Minimises urban stormwater<br />

volumes<br />

Ensures sustainable land<br />

use practices<br />

Minimal<br />

Traditional<br />

Approach<br />

3 4 5 6<br />

1 0 1 0 1 2<br />

0 0 1 0 2 2<br />

1 1 1 2 2 2<br />

2 2 2 1 2 2<br />

0 0 0 0 0 2<br />

0 1 1 1 2 2<br />

Environmental Sum 4 4 6 4 9 12<br />

Environmental Rank 4 4 3 4 2 1<br />

SOCIAL<br />

Improves security of town<br />

water supply<br />

Improves the quality of<br />

drinking water<br />

Improves urban water<br />

service levels<br />

Increases public awareness<br />

of urban water issues<br />

Minimises non-compliance<br />

to policy and legislation<br />

0 0 0 0 2 2<br />

0 0 0 0 0 0<br />

1 3 3 3 3 3<br />

3 1 1 2 2 2<br />

1 3 3 3 3 3<br />

Protects public health 1 3 3 3 3 3<br />

Social Sum 6 10 10 11 13 13<br />

Social Rank 6 4 4 3 1 1<br />

FINANCIAL<br />

NPV ($m over 30 years) 2.24 3.06 2.45 1.74 3.06 3.06<br />

Financial Rank 3 4 2 1 4 4<br />

TBL Score 13 12 9 8 7 6<br />

TBL Rank 6 5 4 3 2 1<br />

According to the TBL assessment criteria, the best option is to transfer sewage to Tomakin,<br />

with the on-site systems retained for greywater treatment or roof water harvesting as<br />

appropriate. Although the cost of this option does not vary significantly from the other<br />

integrated scenarios, it performs best overall against the social and environmental criteria

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!