Eurobodalla Integrated Water Cycle Management Strategy
Eurobodalla Integrated Water Cycle Management Strategy
Eurobodalla Integrated Water Cycle Management Strategy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Eurobodalla</strong> <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> <strong>Strategy</strong><br />
Stormwater reuse<br />
Opportunity Social Environmental<br />
Reduces stormwater impacts<br />
and flooding.<br />
Cost effective means of<br />
upgrading stormwater<br />
capacities.<br />
Help protect oyster industry with<br />
improved run-off entering local<br />
waterways.<br />
Improved public health<br />
outcomes<br />
9.12.4 <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> Scenarios<br />
Controls pollutants entering the<br />
environment.<br />
Improves quality of local<br />
waterways<br />
Reduces erosion from increased<br />
run-off.<br />
Efficient use of water resources.<br />
Reduces pressure on water<br />
supply sources for irrigation<br />
purposes<br />
Using the bundling process, the above water management opportunities can be combined<br />
into integrated scenarios. Table 9-37 presents some examples of integrated scenarios.<br />
Table 9-37 <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> Scenarios for Dalmeny, Kianga and<br />
Narooma<br />
<strong>Management</strong> Option<br />
Improve current sewage system<br />
management<br />
Stormwater quantity and quality control<br />
measures for high priority areas<br />
Stormwater quantity and quality control<br />
measures for low priority areas<br />
Stormwater harvesting and reuse for open<br />
space, playing fields and golf course<br />
irrigation<br />
Minimal/<br />
Scenario<br />
Traditional 2 3<br />
<br />
<br />
Minimal/traditional Improve current sewage treatment system and increase treatment capacity.<br />
<strong>Integrated</strong> Scenario 2 Improve current sewage treatment system, increase treatment capacity and<br />
incorporate stormwater quality and quantity control measures.<br />
<strong>Integrated</strong> Scenario 3 Improve current sewage treatment system, increase treatment capacity,<br />
incorporate stormwater quality and quantity control measures and stormwater reuse.<br />
The TBL assessment (Table 9-38) presents the comparative environmental, social and<br />
economic benefits of each integrated scenario example.<br />
<br />
<br />
191