20.03.2013 Views

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

Eurobodalla Integrated Water Cycle Management Strategy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Eurobodalla</strong> <strong>Integrated</strong> <strong>Water</strong> <strong>Cycle</strong> <strong>Management</strong> <strong>Strategy</strong><br />

Immediate and short term measures as discussion in section 8.3.3. The initial<br />

capacity of northern and southern filtration plants would be 23.5 ML/d and 9 ML/d<br />

A comprehensive demand management comprising:<br />

− Community education targeting outdoor irrigation<br />

− A active program to retrofit water efficient fittings and equipment, such as<br />

shower roses and aerated taps<br />

− Pricing adjustments<br />

− Active system leak detection and repair<br />

10 kL rainwater tank for all new developments with water used for garden, toilet<br />

flushing and washing machines, and a retrofit of 10 kL rainwater tanks in 20% of<br />

existing houses<br />

Provision of reticulated water supply to high priority villages<br />

Provision of reticulated water supply to low priority villages<br />

Opportunistic reclaimed water reuse for agriculture<br />

Reclaimed water reuse for aquifer recharge for subsequent non-potable water use<br />

Reclaimed water reuse for non-potable water use in new developments (dual<br />

reticulation)<br />

Environmental flow substitution in the Moruya River upstream of irrigators on a<br />

greater than 1:3 dilution basis<br />

Non-potable water reuse for garden watering and toilet flushing in new<br />

developments and/or by injecting reclaimed water into the aquifer near Broulee for<br />

subsequent use by the householders through their individual spear points.<br />

Analysis shows that this will defer the need for the southern dam. Analysis indicates that the<br />

Southern dam will be needed between year 2035 and 2040.<br />

103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!