Estcost<br />
108 • <strong>SDM</strong>-DESIGNTRACKER <strong>5.0</strong> USER GUIDE<br />
Additional area to store costs that are not entered into the individual members of the<br />
entity list. Maximum 11 numeric characters (with two decimal positions).<br />
Estcmpldat<br />
The current projection for the completion of the design request. If a project is created<br />
for this design request in <strong>SDM</strong>-ProjectMaster, option 5, Update <strong>SDM</strong>-ProjectMaster<br />
information, from the <strong>SDM</strong>-<strong>DesignTracker</strong> main menu uses the latest estimated date<br />
of completion for all of the tasks associated with the project to update this field. If an<br />
unscheduled task exists in the project and the date of completion is not known this<br />
field will be blank. This date must be entered in YYMMDD format.<br />
Create Design Request (DTCRTDR) Panel 2of 3<br />
This is the second of three panels.<br />
Create Design Request (DTCRTDR) Command<br />
Create Design Request (DTCRTDR) Command<br />
Parameters, Panel 2 of 3<br />
Pmprojname<br />
This is the project name that will be created in <strong>SDM</strong>-ProjectMaster (maximum seven<br />
alphanumeric characters) for the design request. *DRNBR is the default.<br />
Improjref<br />
This is the project name that will be created in <strong>SDM</strong>-Implementer (maximum seven<br />
alphanumeric characters) for the design request. *DRNBR is the default.<br />
Company<br />
The name of the company associated with the design request.<br />
Division<br />
The division within the specified company the design request is for.