You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
76 • <strong>SDM</strong>-DESIGNTRACKER <strong>5.0</strong> USER GUIDE<br />
b) You can set the initial values for the following fields in System<br />
Control:<br />
Type<br />
System<br />
Status set at approval<br />
Requester priority<br />
Benefits priority<br />
Development priority<br />
c) You can set the initial values for the following fields in the user<br />
profile:<br />
Product<br />
Component<br />
Version<br />
Project creation rule<br />
Company<br />
Divisions<br />
Department<br />
Cost center<br />
Contact<br />
3. If <strong>SDM</strong>-ProjectMaster is installed, a project can be entered or you can<br />
specify the default value *DRNBR (design request number) which<br />
creates the project name as DTxxxxx (where xxxxx is the design<br />
request number).<br />
4. If using the project leader or development resource, they must be set up<br />
in the resource master file in <strong>SDM</strong>-ProjectMaster.<br />
5. Press ENTER when you complete your edits. The Work with Design<br />
Requests panel redisplays.<br />
Once a design request is created, you must, at a minimum, perform the following<br />
tasks: Approvals and Work with Entities (Create, Add Related, Ready for Check Out,<br />
and Check Out). You can also attach <strong>SDM</strong>-SupportCenter calls and/or service<br />
requests to the design request.