122 • <strong>SDM</strong>-DESIGNTRACKER <strong>5.0</strong> USER GUIDE<br />

3. The Select Records function allows you to create a report using specific<br />

selection criteria with “And/Or” comparison functionality.<br />

a) Enter the name of the field(s) you want to search. You can press F4<br />

on this field to choose from a list of valid field names.<br />

b) Select the Test parameters to compare the field with a specific<br />

value. You can press F4 on this field to choose from a list of valid<br />

Test parameters.<br />

c) Enter the value you want to search for in the selected field. You<br />

can enter a specific value or press F4 to select from a list of valid<br />

values for the selected field.<br />

d) Use the And/Or field to identify how the values are searched when<br />

the expression contains more than one character string. For<br />

example, if you want to search for all requests that have a status<br />

code of pending and an expected date of 950220, or you want to<br />

include all requests for customer ABC or that have a status code of<br />

AP (approved).<br />

There is no limit to the number of And/Or string comparisons that<br />

can be entered. However, use caution when selecting your<br />

comparisons⎯too many can create a blank report.<br />

e) After all report requirements are determined, press ENTER to<br />

submit the report. The system first validates the selection criteria<br />

and redisplays the Define Subset panel.<br />

f) Press ENTER again to submit the report and redisplay the <strong>SDM</strong>-<br />

<strong>DesignTracker</strong> main menu.<br />

Updating Design Request Information in <strong>SDM</strong>-<br />

ProjectMaster<br />

This batch function is used to update the actual effort, actual cost, and estimated<br />

project completion date for all design requests associated with projects in <strong>SDM</strong>-<br />

ProjectMaster. The estimated date of completion is updated to all associated <strong>SDM</strong>-<br />

SupportCenter calls. The required information is retrieved from the <strong>SDM</strong>-<br />

ProjectMaster database. This advances communication within the project.<br />

This function is required if you want to update the information in <strong>SDM</strong>-<br />

ProjectMaster. A project leader typically performs it, whenever needed.<br />

The program will only process design requests that have an open status code.<br />

To update design request information in <strong>SDM</strong>-<br />

ProjectMaster:<br />

1. On the <strong>SDM</strong>-<strong>DesignTracker</strong> Menu, type option 5, Update <strong>SDM</strong>-<br />

ProjectMaster Information, and press ENTER. The Update DR<br />

ProjectMaster Info panel displays. Or, use Update ProjectMaster<br />

command DTUPDPM at the command line.<br />

2. Select if you want to run the update in batch.<br />

3. Press ENTER to run the update for all the information. The <strong>SDM</strong>-<br />

<strong>DesignTracker</strong> main menu redisplays.