02.05.2013 Views

SDM-DesignTracker 5.0 User Guide - MKS

SDM-DesignTracker 5.0 User Guide - MKS

SDM-DesignTracker 5.0 User Guide - MKS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Creating an <strong>SDM</strong>-Implementer Project in<br />

<strong>SDM</strong>-<strong>DesignTracker</strong><br />

90 • <strong>SDM</strong>-DESIGNTRACKER <strong>5.0</strong> USER GUIDE<br />

This option creates a project in <strong>SDM</strong>-Implementer. The project number includes the<br />

design request number and the entity number.<br />

If you are using project tracking, projects must be created before you can check out<br />

or create promotion requests. This function creates the project; it does not assign the<br />

project (as a user default). An administrator must view Work with Projects to<br />

determine the project number and then assign the default project in Work with <strong>User</strong><br />

Profiles.<br />

This task is only required if project tracking is implemented. A project leader or<br />

developer typically creates the project before check out is performed or a promotion<br />

request is created.<br />

To create an <strong>SDM</strong>-Implementer project in <strong>SDM</strong>-<br />

<strong>DesignTracker</strong>:<br />

1. From the <strong>SDM</strong>-<strong>DesignTracker</strong> Menu, type option 1 and press ENTER<br />

to display the Work with Design Requests panel, or type the Work with<br />

Design Request command DTWRKDR at the command line.<br />

2. Select the design request with option 12=Work with Entity list and<br />

press ENTER to display the Work with Entity List panel.<br />

If an entity list does not exist and you need to create it, press<br />

F8=Crt/Upd PM Project on the Work with Entity List panel. A message<br />

displays stating<br />

“Implementer project DTxxxxx has been created”<br />

The xxxxx represents the design request number you are working on.<br />

3. Press F12=Cancel to redisplay to the Work with Design Requests panel.<br />

Work With Project Tasks Task Variations<br />

1. From the Work with Design Requests panel, select a design request<br />

with option 20 and press ENTER to display the <strong>SDM</strong>-Project Master<br />

Work with Tasks panel.<br />

For a complete description of this panel, see the “Working with Tasks”<br />

section of the <strong>SDM</strong>-ProjectMaster <strong>User</strong> <strong>Guide</strong>.<br />

Some of the tasks that can be performed are: create, change, copy,<br />

display, override, allocate, de-allocate, view history, view estimates,<br />

and view the calendar.<br />

2. Press F3=Exit to redisplay the Work with Design Requests panel.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!