ANSWERS TO PROBLEMS<br />

3 wp = 38.6 m, say 40 m.<br />

4 aN = 8.0m,bN = 1.85 m, EN = 114.2 m3 .<br />

aG = 19.05 m, bG = 4.40 m, EG = 1542.1 m3 ;<br />

A ≤ 8.68 m, V ≥ 1.85 m<br />

5 (a) No. Assuming the same eccentricity for the flow <strong>and</strong> limit ellipsoids,<br />

the height of the limit ellipsoid above the top of the drawpoint is<br />

calculated as 52.4 m.<br />

(b) 24 288 tonne.<br />