ASBESTOSSURVEYREPORT<br />

mws OFENGINEERS- FORT ORD - ABRAMS PARK<br />

BUILDING P06013<br />

<strong>WORK</strong> ITEM INVENTORY<br />

,..<br />

MATERIAL I DESCHIMION / LOCATION<br />

E&Tli$T# ~hTRACTOR<br />

COST<br />

P06013 13<br />

NQof!!aEl@.PR%.@.5rP. M?:t!Q . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .?? P.!F. $0<br />

2 O&M ● Bulk Sample(s) 2,28<br />

WA<br />

● Condition: Good ● Contact: Low<br />

UnitQuantities: ● 1st/2nd Fir Various Locations:<br />

UnitA 90 LF Baseboard mastic observed in the kitchen, laundry room and bathrooms of<br />

Unit B 90 LF Units A, B and C.<br />

Unit C 90 LF<br />

RECOMMENDATIONS: Inspect periodically as part of the O&M. Prohibit any<br />

disturbance including sanding, chipping or the use of corrosive cleaning chemicals<br />

which may cause generation of airborne asbestos fibers. For all removal, repair or<br />

O&M activities, materials inseparable from the mastic must be considered<br />

asbestos-contaminated. Use asbestos-free materials for any replacement.<br />

Additive cost for optional removal and replacement<br />

P06013 13<br />

.<br />

Nonfriable<br />

. . . . . . . --------<br />

Resilient<br />

--------<br />

Floor Tile<br />

-. -..+.and<br />

Mastic<br />

-------- .- .-,,.. . . . . . . . . . ..--’”- -- 2,975.5F.<br />

3<br />

O&M ● Bulk Sample(s) 4, 5, 18, 30<br />

NIA<br />

Unit Quantities:<br />

● Condition: Good ● Contact: Low —Mastic<br />

High – Floor ~le<br />

$2,228<br />

Unit A 1,1s5 SF<br />

● 1st/2nd Flr Various Locations:<br />

Unit B 1,215 SF Brown 12“ x 12“ floor tile - living room, family room, first floor hallway and closets<br />

Unit C 575 SF Units A, B and C; second floor bedrooms, closets and hallway Units A and B.<br />

Black floor tile mastic associated with the brown floor tile on the first floor.<br />

RECOMMENDATIONS: Inspect periodically as part of the O&M. Prohibit any<br />

disturbance including sanding, chipping or the use of corrosive cleaning chemicals<br />

which may cause generation of aitime asbestos fibers. For all removal, repair or<br />

O&M activities, materials inseparable from the mastic must be considered<br />

asbestos-contaminated. Use asbestos-free materials for any replacement.<br />

Additive cost for optional removal and replacement<br />

$32,576<br />

ATC ENVIRONMENTAL INC. PROJECTNO. =W30E<br />

119<br />

$0