PART 1 GENERAL<br />

1.1 SECTION INCLUDES<br />

1.1.1 Submittal Procedures<br />

1.1.2 Submittal Approval<br />

1.1.3 Schedules<br />

1.1.4 Product Information<br />

1.1.5 Drawings<br />

1.1.6 Reports<br />

1.1.7 Records<br />

1.2 SUBMITTAL PROCEDURES<br />

SECTION 01300<br />

SUBMITTALS<br />

1.2.1 Submit schedules, product information, drawings, reports, and records as required<br />

in the particular section of the Work.<br />

1.2.2 All items listed as “IT Approval” (ITA) submittals in the specification will be<br />

mailed directly to the addressee shown below as directed.<br />

Project Manager<br />

IT Corporation<br />

P.O. BOX 1698<br />

Marina, CA 93933-1698<br />

1.2.3 Except as noted in the specification, five copies for items listed as “For<br />

Information Only’ (HO) submittals will be submitted to IT by correspondence at<br />

the address provided above. Items not to be submitted in quintuplicate, such as<br />

samples and test cylinders, will also be submitted to IT.<br />

1.2.4 Transmit each submittal, as specified in the applicable specification sectio~ by<br />

correspondence written on company letterhead.<br />

SJ/5-13-96/SACTERWORDOU2/O 1300 01300-1 Submittals