’-<br />

3.3 FIELD QUALITY CONTROL<br />

3.3.1 Pipeline Testing:<br />

Test pipes for leakage by exfiltration tests. Fill the line with water with a minimum<br />

head of 2 feet above the upper end of the pipeline and let stand until the pipe has<br />

reached maximum absorption for a minimum during of 4 hours. After absorption,<br />

reestablish the head and maintain for 2 hours. ”Measure the amount of water required<br />

to maintain this water level. If leakage exceeds 0.2 gallons per inch diameter per 100<br />

feet of pipeline per hour, take corrective actions and retest.<br />

3.3.2 Backfdl compaction:<br />

● Crushed rock: 95% maximum dry density ASTM D1557<br />

● Initial backfdl: 90% maximum dry density ASTM D1557<br />

● Intermediate backfill: 95’XOmaximum dry density ASTM D1557 under roadways;<br />

90940maximum d~ density elsewhere.<br />

3.3.3 Testing Frequency:<br />

● In accordance with Section 02222, EXCAVATION, TRENCHING, AND<br />

BACKFILLING FOR UTILITIES.<br />

END OF SECTION<br />