- Warning signs will be posted at 100-foot intervals along the length of fencing. Safety fencing<br />

may also be necessary at specific excavation locations as determined by site conditions.<br />

Rovina Patrols<br />

If necessary a subcontract will be executed with a local security firm to implement a roving<br />

drive-by patrol. This will be done in conjunction with local law enforcement agencies.<br />

2.2.5.3 Site-Specific Areas<br />

The project consists of executing work in the 0U2 Landfill areas, on the Fort Ord property. The<br />

security for these areas will consist primarily of the following actions:<br />

● Chainlink security fencing will be installed to form an equipment and materials<br />

yard with locked gate access.<br />

● Materials and supplies will be placed in locked boxes within the fenced yard area.<br />

● Plastic caution tape, iron posts, or fencing will be installed to segregate areas of<br />

work activity.<br />

● Signs stating “Authorized Personnel Only” will be installed around areas of work<br />

activity.<br />

● Warning signs will be erected at specific areas to provide warning of hazardous<br />

conditions in accordance with the requirements of the SSHP.<br />

● Roving patrols will make the necessary patrol stops at specific sites, if required.<br />

2.2.5.4 Traffic Control<br />

Details and locations of road closures and detour signs are shown on the Traffic Control Plan,<br />

Figure 2-3. Work sites that are adjacent to residences, business areas, or walkways normally<br />

used by pedestrians, will be secured with temporary fences. Appropriate warning signs will be<br />

posted on or adjacent to the fences.<br />

2.3 Utilities<br />

Utilities at the site include but are not limited to potable water, natural gas, electrical, sanitary<br />

sewer, storm sewer, telephone, and cable television. Existing utilities will be avoided whenever<br />

.—.. possible. If a utility must be removed to facilitate project completion, it will be rerouted or<br />