Attachment A<br />

Responseto Commentsfrom<br />

CaliforniaIntegratedWaste Management Board<br />

Review of the Remedial Action Work Plan, April 3, 1996<br />

<strong>REMEDIAL</strong> <strong>ACTION</strong> <strong>WORK</strong> <strong>PLAN</strong><br />

<strong>OPERABLE</strong> <strong>UNIT</strong> 2 <strong>LANDFILL</strong> CLOSURE<br />

FORT ORD, CALIFORNIA<br />

TOTAL ENVIRONMENTAL RESTORATION CONTRACT<br />

DACW05-95-D-0001<br />

DELlVERY ORDER NO. 0003<br />

General Response to Comments:<br />

The USACE, through the TERC contract, is constructing the landfill cap in accordance with<br />

approved documents including the Record of Decision (ROD) and approved Harding Lawson<br />

Associates (HLA) designs. The Remedial Action Work Plan (RAWP) is the primary deliverable,<br />

not the HLA design. However the design remains the same. International Technology<br />

- Corporation (IT) is incorporating constructibility improvements to the HLA design in the<br />

Remedial Action Work Plan (RAWP). These improvements enhance the overall design approved<br />

by the Base Cleanup Team (BCT) and are meant to define those areas which deviate from the<br />

approved design. BCT approval is requested to adapt these improvements to the approved<br />

design.<br />

None of these improvements are changes to the basic design concepts and performance<br />

specifications approved in the HLA design documents. Therefore, no Explanation of Significant<br />

Differences (ESD) amendments are required to the ROD based on these constructibility<br />

improvements. The only ESD required to the ROD is currently under review by the EPA, state<br />

and Regional Water Quality Control Board (RWQCB) which adds cleanup criteria to the areas to<br />

be consolidated.<br />

Language will be added to clearly reference the HLA design docurnents.except as they are<br />

needed by the improvements as shown in the wwp and specifically detailed in Table 6.1,<br />

Constructibility Improvements. Table 6.1 verbage will be enhanced to say that these<br />

improvements are incorporated in the RAWP.<br />

Again, no design changes impact the record of decision. In our opinion, there are no “sweeping<br />

design changes” being proposed. The design, in our opinion, is frozen as capped landfill areas<br />

within a low permeable liner and vegetative cover.<br />

SJ/4-23-96/SACTERC/FTORDOU2/CIWMB<br />

A-1