PART 1 GENERAL<br />

1.1 SECTION INCLUDES<br />

1.1.1 References<br />

1.1.2 Definitions<br />

1.1.3 Submittals<br />

1.1.4 Quality Assurance<br />

1.1.5 General Fill<br />

1.1.6 Foundation Layer<br />

1.1.7 Vegetative Cover<br />

1.1.S Bacldl<br />

1.1.9 Borrow Material<br />

1.1.10 Preparation<br />

1.1.11 Excavation<br />

1.1.12 Disposal of Excavated Material<br />

1.1.13 Refuse and Contaminated Soil<br />

1.1.14 Placement<br />

1.1.15 Shoulder Construction<br />

1.1.16 Moisture Control<br />

1.1.17 Compaction<br />

1.1.18 Repairs<br />

1.1.19 Settlement Plate Installation<br />

1.1.20 Construction Tolerances<br />

1.1.21 Finished Surfaces<br />

1.1.22 Field Quality Control<br />

1.1.23 Protection<br />

SECTION 02200<br />

EARTH<strong>WORK</strong><br />

SJ/5-13-96/SACTERC/lTORDOU2/02200 02200-1 Earthwork