Blma A7:cRnA7&~<br />

ASBESTOSSURVEY REPORT<br />

CORPS OF ENGINEERS- FORT ORD - ABRAMS PARK<br />

BUILDING P06013<br />

<strong>WORK</strong> ITEM INVENTORY<br />

<strong>WORK</strong><br />

ITEM ImuHm m<br />

MATERIAL / DE!5CRl~ON / LOCATION<br />

E:J$lWmD<br />

PQ6013 13 NOgf@bl~,R+lj:p! S.h:et. ~!oqr.iu~.qgd.va:! ic . . . . . . . . . . . . . . . . . . . . . . . . .%”.s F. $0<br />

4 O&M ● Bulk Sample(s) 3,29<br />

NIA .<br />

Condition: Good ● Contact: High - Sheet Flooring<br />

Unit Quantities:<br />

Low - Mastic<br />

Unit A 250SF ●<br />

1st/2nd Flr Various Locations:<br />

Unit B 310 SF Tan sheet flooring and mastic - laundry room, kitchen and first floor bathroom<br />

Unit C 290 SF Units A, B and C; second floor bathrooms Units A and B.<br />

RECOMMENDATIONS: Inspect periodically as part of the O&M. Prohibit any<br />

disturbance including sanding, chipping or the use of corrosive cleaning chemicals<br />

which may cause generation of airborne asbestos fibers. For all removal, repair or<br />

O&M activities, materials inseparable from the mastic must be considered<br />

asbestos-contaminated. Any construction, renovation or demolition activities may<br />

render the sheet flooring friable. Use asbestos-free materials for any replacement.<br />

Additive cost for optional removal and replacement:<br />

$10,200<br />

p06013 13<br />

NoufT!6QlP. E?9fi.n9.M?;!E<br />

17SF<br />

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .<br />

5 O&M ● Bulk Sample(s) 49<br />

-.. NIA<br />

. Condition: Good ● Contact: Moderate<br />

_ Roof at Penetration:<br />

Mastic located at penetrations into the roofing membrane.<br />

RECOMMENDATIONS: Inspect periodically as part of the O&M. Prohibit any<br />

disturbance which may cause generation of airborne asbestos fibers. For any repair,<br />

removal or O&M activities, materials inseparable from the roofing mastic must be<br />

considered asbestos-contaminated. Use asbestos-free materials for any<br />

replacement.<br />

Additive cost for optional removal and replacement:<br />

P06013 13<br />

!“!?of!!?bl?.w?I! P?PP[ . . . . . . . . . . . . . .<br />

1650 SF<br />

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...’. . . . . . . .<br />

6 O&M . Bulk Sample(s) 6, 19<br />

NiA<br />

● Condition: Good ● Contact: High<br />

Unit Quantities: ● 1sU2nd Flr Bathroom:<br />

Unit A 550 SF Tan wallpaper observed on the bathroom walls of Units A, B and C.<br />

UnitB<br />

hit C<br />

55o<br />

550<br />

SF<br />

SF<br />

RECOMMENDATIONS:<br />

disturbance, including<br />

inspect periodically as part of the O&M. Prohibit any<br />

sanding or chipping, which may muse generation of airborne<br />

asbestos fibers. For all removal, repair, or O&M activities, materials inseparable from<br />

ATC ENVIRONMENTAL INC.<br />

the wallpaper must be considered asbestos-contaminated. Any construction,<br />

renovation or demolition activities may render the material friable. Use asbestos-free<br />

materials for any replacement.<br />

$825<br />

Additive cost for optional removal and replacement: $22,275<br />

120<br />

COhm;p<br />

$0<br />

$0<br />

PROJECTNO.sOS3WU