3.5,8 Do not push eartldl across sm.ms from lower panel to upper panel. No sudden turns<br />

or accelerations will occur while the equipment is on soil directly above the<br />

geomembrane.<br />

3.5.9 Provide at least 12 inches of cover soil over the geomembrane for heavy construction<br />

equipment.<br />

3.5.10 Do not use probes for checking the depth of cover over the geomembrane or<br />

permanent depth markers or grade stakes extending through the geomembrane.<br />

3.6 SHOULDER CONSTRUCTION<br />

Perform shoulder construction in proper sequence so that adjacent ditches will be drained<br />

effectively and no damage is done to the adjacent completed pavement. The completed<br />

shoulders will be true to alignment and grade and shaped to drain in conformity with the cross<br />

section shown.<br />

3.7 MOISTURE CONTROL<br />

3.7.1 General Fill: Do not add moisture to the general fill except for suppressing dust<br />

emissions.<br />

3.7.2 Foundation Layer and Vegetative Cover: Adjust moisture content of the material by<br />

moisture conditioning, as required to the requirements of Table 02200-1,<br />

EARTH<strong>WORK</strong> TESTING REQUIREMENTS.<br />

3.s COMP<strong>ACTION</strong><br />

3.8.1<br />

3.8.2<br />

3.8.3<br />

General Fill and Lower Foundation Layer (Zone 1): Compact using a minimum of<br />

three passes of cleated-type compaction equipment with a minimum equipment weight<br />

of 20 tons over areas of each lift. For self-propelled compactors, one pass means one<br />

pass of the entire vehicle.<br />

Foundation Layer (Zone 2): Compact upper one foot of foundation material to the<br />

requirements of Table 02200-1, EARTH<strong>WORK</strong> TESTING REQWREMENTS. Use<br />

hand operated tampers in areas where standard compaction equipment cannot be<br />

operated.<br />

Vegetative Layer: Compact vegetative cover material to the requirements of Table<br />

02200-1, ENWH<strong>WORK</strong> TESTING REQUIREMENTS. Density is not to exceed<br />

90 percent. Scarify surface before seeding.<br />

SJ/5.13-96/SACTERC/FfORDOU2/02200 02200-7 Earthwork