ASBESTOSSURVEYREPORT<br />

CORPS OF ENGINEERS- FORT ORD - ABRAMS PARK<br />

BUILDING P06014<br />

<strong>WORK</strong> ITEM INVENTORY<br />

BLOW ATC RAnNW<br />

,.<br />

wfTofK ACYICIW<br />

CONSTR YR MATERIAL / DESClllFllON / LOCATION<br />

P06014 13<br />

P06014<br />

4 O&M<br />

Unit Quantities<br />

Unit A<br />

Unit B<br />

Unit C<br />

Unit D<br />

5<br />

P06014<br />

6<br />

WA<br />

120 SF<br />

60 SF<br />

180 SF<br />

100 SF<br />

13<br />

O&M<br />

WA<br />

13<br />

O&M<br />

WA<br />

Unit Quantities:<br />

Unit A 195 SF<br />

Unit B 195 SF<br />

Unit C 195 SF<br />

Unit D 195 SF<br />

E:~Hi~mD mNTRAcroR<br />

COST<br />

Non~r~able.Resilient . . . . . . Sheet . . . . . . Flooring . . . . . . . and . . . . Mastic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 460 . . . . SF . . .<br />

$0<br />

● Bulk Sample(s) 1,2<br />

●<br />

●<br />

Condition: Good ● Contact: High — Sheet Flooring<br />

1st/2nd Flr Various Locations:<br />

Low - Mastic<br />

Brownsheet flooring and mastic - bathroom Units A, C, D; kfichen Units A and C;<br />

laundry room Units B, C ad D.<br />

RECOMMENDATIONS: Inspect periodically as part of the O&M. Prohibit any<br />

disturbance including sanding, chipping or the use of corrosive cleaning chemicals<br />

which may cause generation of airborne asbestos fibers. For all removal, repair or<br />

O&M activities, materials inseparable from the mastic must be considered<br />

asbestos-contaminated. Any construction, renovation or demolition activities may<br />

render the sheet flooring friable. Use asbestos-free materials for any replacement.<br />

Additive cost for optional removal and replacement: $5,520<br />

Nonfy~qp[e. p.wJ.qg.y?:v:<br />

● Bulk Sample(s) 19<br />

..............................................6.%.<br />

● Condition: Good ● Contact: Moderate<br />

● Roof at Penetration:<br />

Mastic located at penetrations into the roofing membrane,<br />

RECOMMENDATIONS: Inspect periodically as part of the O&M. Prohibit any<br />

disturbance which may cause generation of aicborne asbestos fibers. For any repair,<br />

removal or O&M activities, materials inseparable from the roofing mastic must be<br />

considered asbestos-contaminated. Use asbestos-free materials for any<br />

replacement.<br />

Additive cost for optional removal and replacement: $825<br />

N9nfti5ElP.w?l!P?P? [ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..?W.?F.<br />

● Bulk Sample(s) 29-32<br />

. Condition: Good ● Contact: High<br />

● 1st/2nd Flr Bathroom.<br />

Tan wallpaper obsetved on the bathroom walls of Units A, B and C.<br />

White painted wallpaper observed on the bathroom walls of Unit D.<br />

RECOMMENDATIONS: Inspect periodically as part of the O&M. Prohibit any<br />

disturbance, including sanding or chipping, which may cause generation of airborne<br />

asbestos fibers. For all removal, repair, or O&M activities, materials inseparable from<br />

the wallpaper must be considered asbestos-contaminated. Any construction,<br />

renovation or demolition activities may render the material friable.<br />

materials for any replacement.<br />

Use asbestos-free<br />

Additive cost for optional removal and replacement: $11,115<br />

ATC ENVIRONMENTAL INC. PROJECTNO.-WKNI<br />

137<br />

$0