. ..>, Haul roads, setbacks, and soil stockpile areas will be, used as mitigation areas at the completion<br />

of landfill construction as follows:<br />

● Haul roads around and through the landfill area will be minimized both in length<br />

and width as specified by the installation DENR specialist. Decommissioned<br />

roads may be replanted with sand gili% Monterey spine flower or coast live oak<br />

trees, depending on existing habitat as designated by the installation DENR<br />

specialist.<br />

● Soil stockpile areas approved by the installation DENR specialist will be grubbed<br />

(top six to nine inches). Grubbed material will be screened to remove roots and<br />

debris and will be placed as the top four inches after grade restoration. Stockpile<br />

areas will be minimized by using sites on the landfill areas for storage. The 25foot<br />

setback will also be used for soil storage. Soil stockpile areas occurring in -<br />

oak woodland will be replanted with the same number and density of oak trees<br />

that are removed. Stockpile areas that are in previously disturbed locations could<br />

be used to re-establish coast live oak woodland or both sand gilia and Monterey<br />

spine flower.<br />

● Setback areas as approved by the installation DENR specialist could provide<br />

suitable habitat for establishing populations of both sand gilia and Monterey spine<br />

flower.<br />

2.77.2 Dust Control<br />

During construction activities, particular emphasis will be placed on minimizing the generation<br />

of fugitive emissions. The following operational and administrative controls will be used in<br />

controlling fugitive dust during excavation and capping activities. However, conditions may<br />

dictate the necessity of operational and administrative controls.<br />

2.71,2.7 Operational Controls<br />

Water will be used as a general dust suppressant. Haul roads will use a soil stabilizer product<br />

called EMC Squared. The material safety data sheet (MSDS) for the soil stabilizer is on file.<br />

Operational controls include the following:<br />

● Minimizing material free faII from excavating equipment (loaders and excavators)<br />

to hauling units and stockpiles<br />

.-—--- ● Covering or water spraying loads when transporting materials<br />

● Covering or water spraying stockpiles<br />

.-.<br />

SJ16-24-961SACTERCIFTORD OUVRAWP.RV1<br />

2-41