1.4 DOCUMENT FORMATS AND METHODS<br />

1.4.1 Specifications<br />

●<br />

●<br />

●<br />

●<br />

●<br />

●<br />

Format: Although some portions of these specifications may not be in<br />

complete compliance with one format, no particular significance will be<br />

attached to such compliance or non-compliance.<br />

Imperative Language: Except as otherwise indicated, requirements<br />

expressed imperatively are to be performed by Subcontractor.<br />

Overlapping Requirements: Where there is a conflict between or within the<br />

Contract Documents or where compliance with two or more industry<br />

standards or sets of requirements is specified, and the different standards or<br />

requirements establish different levels of quality, the most stringent<br />

requirement is intended, is assumed to have been bid, and will be enforced<br />

without cost to Government. Refer requirements that are different but<br />

approximately equal, and uncertainties as to which quality level is more<br />

stringent to the Government for a decision before proceeding.<br />

Minimum Quality: The quality level shown or specified is intended to be the<br />

minimum for the work. The work may either comply with that minimum<br />

quality (within specified tolerances), or may exceed that minimum quality<br />

within reasonable limits.<br />

Specialists: In certain instances, specification text requires that work is to be<br />

assigned to specialists or expert entities. Such assignments are intended to<br />

establish which party or entity involved in a specific unit or work is<br />

recognized as “expert” for the indicated construction processes or operations.<br />

Nevertheless, the final responsibility for fulfillment of the entire set of contract<br />

requirements remains with the Subcontractor.<br />

Incomplete Sentences or Abbreviations: The language of specifications and<br />

other Contract Documents is of the abbreviated or streamlined type in certain<br />

instances, and implies words and meanings appropriately interpreted.<br />

1.4.2 Drawing Formats<br />

● In some cases, drawings maybe reduced from stated scale or not drawn to<br />

scales. Do not scale drawings.<br />