3.2<br />

3.3<br />

3.4<br />

3.5<br />

3.6<br />

UTILITIES<br />

3.2.1 Disconnection of Utility Services: Utilities will be disconnected if necessary. Where<br />

such disconnection will interrupt the utility services to an area not included in this<br />

Contract, arrangements for such interruption will be made with IT at least 72 hours<br />

before the interruption. IT will noti~ utility companies as necessary.<br />

3.2.2 Removal of Utilities: Remove, relocate, and replace utilities within the landfill limits<br />

in Area A. Remove and replace utilities within Area ~ outside the landfill limits (i.e.,<br />

along Imjin Road and Abrams Drive). When utility lines are encountered that are not<br />

indicated on the drawings, IT will be notified.<br />

3.2.3 Protection: Preserve in operating condition, unless otherwise noted, all active utilities<br />

traversing project site. Repair damage to such utilities caused by work under this<br />

Contract to the satisfaction of IT.<br />

ROADS<br />

Sections of Abrams Drive and Imjin Road will be removed as shown on the drawings to allow<br />

excavation of refuse. Replace the demolished sections of road as shown on the drawings.<br />

FENCES<br />

Remove and dispose of existing fences within the construction limits according to the<br />

approved Work Plan.<br />

FILLING<br />

Fill holes and other hazardous openings resulting from demolition with satisfactory material.<br />

DISPOSITION OF MATERIAL<br />

3.6.1 Demolition Materials<br />

Title to nonhazardous materials and equipment to be demolished, is vested in the<br />

Subcontractor upon receipt of Notice to Proceed. Demolished materials will be<br />

removed from Government property before completion of the contract. Demolished<br />

materials will not be sold on the site.<br />

3.6.2 Material Salvaged for the Subcontractor<br />

Material salvaged for the Subcontractor will be stored as approved by IT and will be<br />

removed from Government property before completion of the contract. Material<br />

SJ/5-lA96/SACTERC/lTORDOWZ/0205 O 02050-3 Demolition