2.0 Work Plan<br />

The MWP has been prepared to take advantage of the desigrdbuild concept. The design is<br />

based on the information and data currently available. During construction, IT will determine if<br />

constructibility improvements can be implemented to reduce construction costs while<br />

maintaining the regulatory and engineering requirements such as:<br />

● A. minimum co~er slope of 3 percent<br />

● Extension of the flexible membrane liner (FML) a rninimurn of five feet beyond the<br />

perimeter of the refuse<br />

● Appropriate liner material selection<br />

● Adequate cover drainage<br />

● Stable cover slope.<br />

The constructibility improvements currently identified include:<br />

●<br />

●<br />

●<br />

●<br />

●<br />

●<br />

●<br />

●<br />

Lowering or raising finish elevations<br />

Increasing the vegetative cover thickness<br />

Modification of the perimeter berm<br />

Deletion of the irdltration basins<br />

Deletion of drainage pipes<br />

Modification or deletion of drainage swales<br />

Combining the general fill and foundation layer<br />

Minimizing material haul distances.<br />

Design modifications will be documented by an engineering review to determine the end product<br />

suitability, cost savings, and constructibility.<br />

The following is an overview of the 0U2 Landfill Closure program. A Site Plan (Figure 2-1)<br />

showing features pertinent to this WWP, is provided for general reference.<br />

2.7 Overview<br />

Area A<br />

The refuse currently located in trenches in Area A will be excavated and transported to Areas B<br />

through D as general fill. Clean soil from Area A will also be transported to stockpiles for<br />

backfill in Area A.<br />

SJ/6-24-96/SAC’ERCHOD 0U2iRAWP.RVl<br />

2-1