UXO DEMOLITION CHECKLIST<br />

Attachment A<br />

Be sure to equalize electrical potential “Ground” wherever appropriate.<br />

A.<br />

B.<br />

c.<br />

D.<br />

E.<br />

F.<br />

G.<br />

H.<br />

1.<br />

J.<br />

K.<br />

L.<br />

M.<br />

N,<br />

o.<br />

All notifications have been made.<br />

Site is secure.<br />

Ensure the blasting machine is with the downrange team.<br />

Test the firing cable for continuity and short the wires or clips.<br />

Barricade the electrical blasting caps (EBCS).<br />

Remove the shunt on an EBC.<br />

Facing away from the barricade, test the ccmtinuity of the EBC with a galvanometers.<br />

Replace the shunt or short the EBC.<br />

Repeat steps F, G, and H for the second EBC.<br />

Recheck the firing cable to ensure the cable is shorted.<br />

Make a parallel or series circuit, as appropriate, and connect the leg wires of the<br />

EBCS to the firing cable.<br />

Connect the EBCS to the main charge as appropriate.<br />

Using binoculars, ensure the area is clear and blow the air or vehicle horn three<br />

times.<br />

Fire the charge.<br />

Conduct a destruction site inspection.<br />

11