. 3.8 VEGETATIVE COVER MAINTENANCE DURING ESTABLISHMENT PERIOD<br />

..<br />

3.8.1 Maintenance of the planted areas will include eradicating weeds, protecting<br />

embankments and ditches from erosion, maintaining erosion control materials and<br />

protecting planted areas from trafllc.<br />

3.8.2. Irrigation will be required either to augment or substitute for natural rainfall if the<br />

timing of seed application does not occur at the beginning of a natural wet period.<br />

A minimum 6-month wet establishment period is required. Conduct watering to<br />

provide this minimum 6-month period and apply at a rate sufficient to ensure moist<br />

soil conditions but not cause pending or runoff.<br />

END OF SECTION<br />

SJW14-96\SA~ERCWORDOU2\02935 02935-6 Hydroseeding