PART 1 GENERAL<br />

1.1 SECTION INCLUDES<br />

1.1.1<br />

1.1.2<br />

1.1.3<br />

1.1.4<br />

References<br />

Submittals<br />

1.2 REFERENCES<br />

SECTION 01410<br />

SOIL, PAVING, AND ROAD SURFACE TESTING<br />

Quality Assurance<br />

Laboratory responsibilities<br />

The publications listed below form a part of the specification to the extent referenced. The<br />

publications are referred to in the text by basic designation only.<br />

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)<br />

ASTM D3470 Criteria for Evaluation of Agencies Engaged in Testing/Inspection of<br />

Soil/Rock (as used in engineering design/construction) Practices.<br />

CODE OF FEDERAL REGULATIONS (CFR)<br />

29 CFR 1910 Occupational Safety and Health Standards<br />

1.3 SUBMITTALS<br />

1.3.1 Prepare submittals in accordance with Section 01300, SUBMITTALS.<br />

1.3.2 Submit calibration cumes and test results (FIO).<br />

1.3.3 Submit sampling data on daily field logs (FIO).<br />

1.3.4 Prior to performing the work field and laboratory personnel must submit evidence of<br />

qualifications, including (ITA):<br />

SJ/5-13-96/SACTERC/’FTORDOU2/O<br />

1410 01410-1 Soil, Paving, and Road<br />

Surface Testing