10. Comment:<br />

This section is inadequate to describe the activity which will be the major determinate of the quality<br />

of the closure. No material or construction specifications are referenced, and no quality control plan<br />

is described. Please reference the applicable specifications. Additionally, the text implies that liner<br />

seaming could be adequately performed by extrusion in place of fhsion. What is the basis for<br />

extrusion being an acceptable altmnative?<br />

Response:<br />

This section of the RAWP is not intended to be the specification or the quality control plan.<br />

Specification Section 02271 Flexible Membrane Liner, will be used as the basis for bidding and<br />

selecting a supplier and installer. A third party subcontractor will be used for quality control during<br />

manufacture and installation.<br />

The text mentions fusion and extrusion welding, both of which are used for the installation of<br />

polyethylene geomembrane. Panel welding is done using a hot-wedge fusion welder, however<br />

extrusion welding is used for patching panels and pipe penetrations, i.e. in areas where a fusion<br />

welder will not work. There was no implication intended to substitute fusion welding for extrusion<br />

welding.<br />

Action:<br />

Section 2.7.1, last paragraph, delete and replace with:<br />

“A specialty liner installation company will be subcontracted to famish and install the FML. Part<br />

of the acquisition process requires submittal of company and personnel experience before award<br />

of a subcontract.”<br />

11. Comment:<br />

During placement of the first lift of cover over the flexible membrane liner, this section states:<br />

“Material will initially be placed. . . . a track mounted excavator. . . . a Low Ground Pressure (LGP)<br />

dozer” . . . This equipment is not listed in the equipment lists on Tables 7-1 through 7-3. Please<br />

explain or list this equipment.<br />

Response:<br />

The track-mounted excavator is listed in Table 7-2 under the heading “Excavator”. A Cat 225<br />

excavator is a track-mounted excavator.<br />

The low ground pressure dozer is the D6 dozer. Table 7-3, Support Equipment does not include<br />

major earthmoving equipment.<br />

Action:<br />

Table 7-1 will be revised to include the excavator. The LGP dozer will be clarified on Tables 7-1<br />

and 7-2.<br />

SJ/4-23-96/SACTERC/FTORDOU2/USEPA<br />