geomembrane on 3 horizontal to 1 vertical (3:1) sideslopes around the landfill perimeter.<br />

However, for erosion control and maintenance purposes, a 4:1 sideslope is now proposed.,<br />

California Code of Regulations (CCR) Title 14, Division 7, Article 7.S, Section 17777 requires a<br />

slope stability report for sideslopes less than 3:1, Therefore, stability calculations are not required<br />

for 4:1 vertical sideslopes.<br />

Action:<br />

Change perimeter sideslopes to 4:1.<br />

8. Comment:<br />

The drainage and final grades will also be revised. Since these are important factors in the slope<br />

stability analysis and 14 CCR requirements, CIWMB staff will also need to review these design<br />

modifications.<br />

Response:<br />

The final sideslope soil-geomembrane grades will be reduced from 2 horizontal to 1 vertical (2:1)<br />

to 4:1. The final cover grades will be increased from the regulatory minimum of three percent to<br />

not greaterthan 10 percent. This later grade is less than the sideslope grades, so the cover slopes<br />

should also be stable.<br />

The modification to the drainage pattern and design is minimal. As with the original design,<br />

stormwater drainage is directed off the landfill cover to an intltration trench instead of an<br />

irrilltration basin.<br />

Action:<br />

Constructibility improvements are shown on Figure 2-16. Construction specifications will be<br />

included in Appendix G - Construction Specifications.<br />

SJ/4-23-96/SACTERCiFTORDOU2/CIWM13<br />