Identify Project, Subcontractor, or Subcontractor supplieq pertinent drawing and<br />

detail number andspecification number, as appropriate. Units ofweights and<br />

measures used on submittals will be the same used in the Contract Drawings.<br />

Apply Subcontractor’s stamp, signed or initialed certifyhg that review, verification<br />

of products required, field dimensions, adjacent construction Work, and<br />

coordination of information, is in accordance with the requirements of the Work.<br />

For each submittal for review, allow 35 calendar days, excluding delivery time to<br />

and from IT.<br />

Each submittals will be complete and sufficient in detail to allow ready<br />

determination of compliance with Contract Requirements. Variations from<br />

Contract Documents, and product or system limitations which maybe detrimental<br />

to successful performance of the completed Work, will be identified.<br />

Provide space for review stamps.<br />

Prior to submittal, all items will be checked -and approved by the Subcontractor’s<br />

Quality Control (CQC) representative. Each item will be stamped, signed, and<br />

dated by the CQC representative indicating action taken.<br />

Revise, resubmit, and identify changes made since previous submission.<br />

Distribute copies of reviewed submittals as appropriate. Instruct parties to<br />

promptly report any inability to comply with provisions.<br />

SUBMITTAL APPROVAL<br />

1.3.1 Approved Submittals<br />

1.3.1.1 IT approval of submittals will not be construed as a complete<br />

check, but will indicate only that the general method of<br />

construction, materials, detailing and other information are<br />

satisfactory.<br />

1.3.1.2 Approval will not relieve the Subcontractor of the responsibility for<br />

any error which may exist, as the Subcontractor under the<br />

Construction Quality Control requirements of this contract is<br />

responsible for dimensions, the design of adequate connections and<br />

details, and the satisfactory construction of work.<br />

SJ/5-13-96/SACTERC/lTORDOU2/O 1300 01300-2 Submittals